This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 20, 2017
Cottesloe Pier Pty Ltd proposes to construct a pier extending off the end of the current Cottesloe groyne. The project design consists of a jetty and boardwalk structure including an underwater observatory, cafe, swimming area and fishing jetty. Read more...Last updated: October 31, 2017
Development of an integrated water supply and wastewater treatment system on Rottnest Island Read more...Last updated: September 18, 2017
The Monkey Mia Dolphin Resort is located within the Shark Bay World Heritage Area, and adjacent to the Monkey Mia Recreation Zone of the Shark Bay Marine Park. The original resort facilities were established around 1985 and therefore not subject to environmental impact assessment under the EP Act, ., In 2002 a proposal to expand the existing resort area and increase the capacity from 600 to 1200 overnight guests, provide staff accommodation facilities, and upgrade the wastewater treatment plant... Read more...Last updated: August 21, 2017
The proponent, Mr Graeme Robertson, proposes to extract and process lime on Lot 9005 Rock Cliff Circle, Nullaki Peninsula, Albany. The proposal is located 10 kilometres south east from the Denmark townsite. The Bibbulmun Track is located east of the proposal site in Reserve 17464, approximately 500 metres (m) from the proposed extraction area. The proposal would include staged development of a 7.5 hectare (ha) lime pit and 2ha stockpiling area, with excavations up to 8m in depth. The... Read more...Last updated: August 14, 2017
This is the inquiry into a request for changes to Ministerial Statement 709 , relating to the Expansion of the Monkey Mia Dolphin Resort . Read more...Last updated: July 31, 2017
Elan Energy Matrix Pty Ltd proposes to construct and operate a Tyre Resource Recovery Facility to recycle used tyres at 9 Fargo Way Welshpool, approximately 12 kilometres southeast of Perth within a ‘General Industry’ zone in the City of Canning. The proposal will involve thermal processing of used tyres to produce carbon black (material derived from char), steel wire, oil and process gas using an indirect fired thermal conversion unit. The plant will be located within enclosed buildings.... Read more...Last updated: July 27, 2017
Tungsten Mining NL proposes to extract and process tungsten and molybdenum from the Mulgine Hill and Mulgine Trench deposits at Mount Mulgine over a period of 15 years. The proposal is located approximately 15 km north east of Rothsay, within the Shire of Perenjori. The proposal is partially located: on M59/425, which was previously mined for gold as part of the Minjar Gold Mine Project within the former Warriedar pastoral station, which is managed for conservation purposes by the Department of... Read more...Last updated: July 17, 2017
The Department of Fisheries, on behalf of the Minister for Fisheries proposes to create an ‘Aquaculture Development Zone’ to provide a management precinct for prospective future aquaculture proposals within State Waters, approximately 75 kilometres west of Geraldton within the Fish Habitat Protection Area of the Abrolhos Islands. The strategic proposal area has been selected by the proponent to maximise suitability for marine finfish aquaculture, and minimise potential impacts on existing... Read more...Last updated: July 17, 2017
The proposal is to subdivide Lot 21 Webster Road, Forrestfield into seven (7) industrial lots as documented in Schedule 1 of Ministerial Statement 841 . The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions relating to the Industrial Subdivision of Lot 21 Webster Road Forrestfield proposal in order to extend the “Commencement and Time Limit of Approval” for substantial... Read more...Last updated: July 17, 2017
The proposal is for the development and operation of the Parker Range Project, located in the Mount Caudan section of the Parker Range within the Shire of Yilgarn. It includes the development and operation of an above and below the watertable greenfields iron ore mine and associated infrastructure. This is an inquiry under s46 into a request to extend the Time Limit of Authorisation of Ministerial Statement 892 . Read more...Last updated: June 29, 2017
The proposal is for the expansion of the Monkey Mia Dolphin Resort, incorporating both construction and operation. There are three primary components to the proposal: increasing the capacity of the Resort from approximately 600 to 1200 guests per night through an increase from its current area of 3.74 hectares (ha) up to 6.84 ha; developing a new staff accommodation precinct of 2.3 ha immediately to the west of the existing Resort area, incorporating accommodation, recreational facilities and... Read more...Last updated: June 28, 2017
Sinosteel Midwest Corporation proposes an expansion of its existing operations at the Blue Hills Iron Ore Mine, involving the construction and operation of two new mine pits and waste rock dumps. A new processing plant and additional road infrastructure will also be established. The EPA set the level of assessment on the Blue Hills Mungada East Expansion Project by Sinosteel Midwest Corporation, as an Assessment on Proponent Information, category B (environmentally unacceptable). Following the... Read more...Last updated: June 28, 2017
The proposal is to construct and operate two iron ore mines, haul roads and mine infrastructure in the Yilgarn area of Western Australia, 100 kilometres north of Southern Cross. The EPA set the level of assessment on the Jackson 5 and Bungalbin East Iron Ore Project by Polaris Metals Pty Ltd, as an Assessment on Proponent Information, category B (environmentally unacceptable). Following the appeal period and the Ministers subsequent determination on the Appeals received, the Minister remitted... Read more...Last updated: June 22, 2017
Proposal by BHP Iron Ore Pty Ltd to develop 14 iron ore deposits at Mining Area C-Northern Flank, 100 km north west of Newman. Read more...Last updated: June 6, 2017
The proposal is to construct and operate a freeway-standard dual carriageway between the Reid Highway/Tonkin Highway junction and the Great Northern Highway at Muchea. Read more...Last updated: May 22, 2017
In response to matters raised in the 7-day public comments on the referral, the proponent provided the following clarifying information: 1. Proponent consultation with the Shire of Irwin; 2. Rehabilitation Monitoring Report for the Redhill South 01 well site; 3. Proponent response to 7-day public comments. Read more...