Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (10) Apply Iron Ore filter
  • Infrastructure (8) Apply Infrastructure filter
  • Industrial (3) Apply Industrial filter
  • Sand, rock, gravel and clay (3) Apply Sand, rock, gravel and clay filter
  • Clearing (2) Apply Clearing filter
  • Oil and gas (2) Apply Oil and gas filter
  • Coal (1) Apply Coal filter
  • Gold (1) Apply Gold filter
  • Rare earth elements (1) Apply Rare earth elements filter

Filter by current status:

  • Ministerial Statement published (19) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (6) Apply Decision on whether to assess has been published filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter

Filter by preliminary environmental factors:

  • (-) Remove Flora and Vegetation filter Flora and Vegetation
  • Terrestrial Fauna (14) Apply Terrestrial Fauna filter
  • Hydrological Processes (10) Apply Hydrological Processes filter
  • 37 (8) Apply 37 filter
  • Inland Waters Environmental Quality (8) Apply Inland Waters Environmental Quality filter
  • Social Surroundings (6) Apply Social Surroundings filter
  • Terrestrial Environmental Quality (4) Apply Terrestrial Environmental Quality filter
  • Subterranean Fauna (3) Apply Subterranean Fauna filter
  • Benthic Communities and Habitats (2) Apply Benthic Communities and Habitats filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • Landforms (1) Apply Landforms filter
  • Marine Environmental Quality (1) Apply Marine Environmental Quality filter
  • People (1) Apply People filter

Filter by Proponent:

  • Fortescue Metals Group (3) Apply Fortescue Metals Group filter
  • Cliffs Asia Pacific Iron Ore Pty Ltd (2) Apply Cliffs Asia Pacific Iron Ore Pty Ltd filter
  • Water Corporation (2) Apply Water Corporation filter
  • Atlas Iron Limited (1) Apply Atlas Iron Limited filter
  • Aviva (1) Apply Aviva filter
  • BHP Billiton Iron Ore (1) Apply BHP Billiton Iron Ore filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • BHP Iron Ore Pty Ltd. (1) Apply BHP Iron Ore Pty Ltd. filter
  • Central West Coal (1) Apply Central West Coal filter
  • Crosslands Resources Ltd (1) Apply Crosslands Resources Ltd filter
  • CSR Gyprock Fibre Cement (1) Apply CSR Gyprock Fibre Cement filter
  • Empire Oil and Gas NL (1) Apply Empire Oil and Gas NL filter
  • FMG Iron Bridge (1) Apply FMG Iron Bridge filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • Greatland Pty Ltd (1) Apply Greatland Pty Ltd filter
  • Karara Mining Ltd (1) Apply Karara Mining Ltd filter
  • LG and HM McDonald (1) Apply LG and HM McDonald filter
  • Pilbara Iron Pty Ltd (1) Apply Pilbara Iron Pty Ltd filter
  • Point Grey Development Company Pty Ltd (1) Apply Point Grey Development Company Pty Ltd filter
  • Portman Iron Ore Limited (1) Apply Portman Iron Ore Limited filter
  • Reed Resources Ltd (1) Apply Reed Resources Ltd filter
  • Rio Tinto Iron Ore (1) Apply Rio Tinto Iron Ore filter
  • Robe River Iron Associates (1) Apply Robe River Iron Associates filter
  • Robe River Mining Co Pty Ltd (1) Apply Robe River Mining Co Pty Ltd filter
  • Western Australian Land Authority (1) Apply Western Australian Land Authority filter

Filter by region:

  • Pilbara (13) Apply Pilbara filter
  • Mid West (4) Apply Mid West filter
  • Peel (2) Apply Peel filter
  • South West (2) Apply South West filter
  • Wheatbelt (2) Apply Wheatbelt filter
  • Gascoyne (1) Apply Gascoyne filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter
  • Perth (1) Apply Perth filter

Filter by last updated:

  • (-) Remove 2012 filter 2012
  1. Home
  2. Proposal search
  3. 2012
  4. Flora and Vegetation

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Borrow Pits in Millstream Chichester National Park

Last updated: December 20, 2012

The proposal is for seven borrow pits in the Millstream Chichester National Park (MCNP) where up to 118 hectares (ha) will be disturbed, of which 90 ha is within the national park and the remainder in the excised rail corridor. All borrow pits within the MCNP are within existing Rio Tinto Iron Ore licence areas granted under the, Mining Act 1978, (Robe River Mining Company is a subsidiary of Rio Tinto) and all borrow material will only be used for projects or portions of projects that are... Read more...

Wannamal 3D Seismic Survey over Gingin Gas Field

Last updated: December 17, 2012

Empire is proposing to conduct a 3D seismic survey over the Gingin Gas Fields including parts of the Boonanarring and Bartlett's Well nature reserves, utilising a helicopter assisted or 'heliportable' technique, transporting drilling and seismic receiver equipment by a long-line, suspended beneath a helicopter. The equipment is lowered into position and released at pre-programmed points. Charges are detonated one at a time and seismic data is recorded. Site remediation and site... Read more...

Newman Satellite Development - Orebody 23

Last updated: December 4, 2012

The proposal is for mining of iron ore below the watertable from the Orebody 23 deposit on the Ophthalmia Range, including de-watering operations, approximately 13 kilometres north-east of Newman, Shire of East Pilbara. Read more...

Barrambie Vanadium Project

Last updated: October 22, 2012

To develop an open-cut vanadium mine and process plant at Barrambie, 75 kilometres north-west of the Sandstone townsite and 116 kilometres south-east of Meekatharra Read more...

Augusta Wastewater Treatment plant (s. 46)

Last updated: October 4, 2012

Request to change implementation conditions of Ministerial Statement 126 . Read more...

Ravenswood/West Murray 2A lnfill Sewerage Project

Last updated: September 17, 2012

The proposal is to construct infill sewerage infrastructure within an existing built-up area in the location of Ravenswood. The new infrastructure would service 54 residences that are currently utilising septic tanks and leach drains and are all situated in close proximity to the Murray River. The key components of the proposal involve: construction of approximately 1.3 km of dual pressure 100 mm diameter sewer pipelines and 1.5 km of gravity sewer pipeline;  construction of a 'Type 1 0... Read more...

Exploration activities Eliwanna Prospect on E47/1301, E47/1302, E47/1195 and E47/2037: Talisman East Project approximately 75 km north-west of Tom Price

Last updated: September 10, 2012

The proposal is for exploration activities on mining leases E47/1301, E47/1302, E47/1196 and E47/2037, approximately 75 km north-west of Tom Price, Pilbara region. Read more...

Resource extraction and earthworks for future industrial land development

Last updated: September 10, 2012

The most significant impact of the proposed resource extraction involves the clearing of 219 hectares of native vegetation. A beneficial outcome of the proposal is the retention of 218ha of remnant native vegetation for conservation purposes, which includes: • Bush Forever sites 293 and 384 (119ha); and • Threatened Ecological Community (FCT 26a) and Priority Ecological Community (FCT24) (99ha). Read more...

Windarling Range W3/5 Deposit Deepening

Last updated: August 29, 2012

The proposal is situated on Mining Leases M77/999 and M77/1000, approximately 130 kilometres north of Southern Cross in the Shire of Yilgarn. The proposal is to mine iron ore by open cut mining below the groundwater table in the portion of the W3/5 Deposit at Windarling Range. The depth of the open-cut mine will increase from nominally 400 metres Australian Height Datum (AHD) to nominally 315 metres AHD. Read more...

North Star Hematite Project

Last updated: August 6, 2012

FMG Iron Bridge Limited proposes to develop the North Star Hematite Project (the Project), located approximately 110 km south of Port Hedland in the Pilbara region of Western Australia.  The Project includes a new mine with one open pit, one waste dump, processing area, accommodation camp, sewerage treatment, workshops, fuel storage and other associated mine infrastructure to enable extraction of oxide ore at a rate of up to 5.0 Mtpa for approximately 2.3 years. Ore will be processed through... Read more...

Point Grey Marina

Last updated: August 1, 2012

The proposal is for the construction of an onshore marina (and associated boating infrastructure e.g. boat pens, jetties, navigational aids, entrance channel, protective groynes, public boat ramps and car parks) on the western side of the Point Grey peninsula. The proposal also includes the construction of a 2.5 kilometre navigation channel across the Harvey Estuary from the marina to the Dawesville Channel. Read more...

Pardoo Direct Shipping Ore Project Port Hedland

Last updated: July 24, 2012

The proposal is to develop and operate a direct shipping iron ore project in the Pilbara. The project involves the open-cut mining of eight small pits approximately 70 kilometres east of Port Hedland to obtain direct shipping ore quality haematite. Annual ore production will be 1.5 million tonnes. Read more...

Cape Lambert to Emu Siding Rail Duplication

Last updated: June 19, 2012

The proposal is to construct and operate approximately 70 km of duplicate rail line and supporting infrastructure from the Cape Lambert Port facilities to Emu Siding. Read more...

Expansion to Limestone Quarry on Mining Lease 08/06 Sub Lease 3H/034, 8 km south-west of Exmouth

Last updated: May 30, 2012

The proposal is to clear up to 3.7 hectares of native vegetation for a limestone quarry, to screen the material on-site, re-establish an access road and rehabilitate all of the disturbed areas. Read more...

Koolyanobbing Iron Ore Project, Windarling W2 pit mining below the groundwater table

Last updated: May 30, 2012

The proposal is for open-cut mining of iron ore (haematite) below the groundwater table at the currently mined W2 pit at Windarling, approximately 90 kilometres north-north-east of Koolyanobbing. The open-cut mine will require a depth increase of approximately 114 metres from nominally 402 metres Australian Height Datum (AHD) to 288 metres AHD. This will enable mining of an estimated six million tonnes of ore. Read more...

Central West Coal Project

Last updated: May 22, 2012

The project site is located approximately 15 kilometres south of Eneabba in the Shires of Coorow and Carnamah, Western Australia. The CWC Project involves open cut mining and supply of approximately 75 Mt of sub-bituminous grade coal to the proposed Coolimba Power Station at a rate of 2 to 2.5 Mtpa over 30 years. The South Eneabba Nature Reserve is at the southern end, east of the proposed mine, while the Lake Logue Nature Reserve is towards the northern end and on the western side of the... Read more...

Karara Iron Ore Project, 215 km east-south-east of Geraldton and 320 km north-north-east of Perth, Shire of Perenjori (s. 46)

Last updated: May 4, 2012

Inquiry under s46 regarding amendments to the conditions of Ministerial Statement 805 . Read more...

Telfer Project, Power Supply and Infrastructure Corridor, Port Hedland to Telfer Gold Mine, Great Sandy Desert

Last updated: May 2, 2012

The proposal is to supply power to an expanded mining operation at the Telfer Gold Mine. The proposed expansion of the Telfer Gold Mine associated with this proposal is being dealt with separately. That mine expansion is set out in a separate referral to the EPA (Newcrest Mining Limited 2002b). The mine expansion and power supply proposals have been separated because it is likely that the mine and power supply will eventually be operated by different proponents. Nevertheless, the proposals have... Read more...

Cape Lambert Port upgrade - increase in throughput to 85 Mtpa

Last updated: April 4, 2012

The proposal is to increase the throughput of iron ore to 85 million tonnes per annum at the Cape Lambert Port operations. Read more...

Io Direct Shipping Iron Ore Project

Last updated: April 2, 2012

The proposal is to expand Fortescue Metals' current operations within the Pilbara region, Western Australia to include the development of a new iron ore project, known as the Io Project, which is located within the Nyidinghu Study Area. The Project is located on Marillana Station approximately 40 kilometres (km) south of Fortescue’s Cloudbreak operations and approximately 100 km north-west of Newman. The major components of the Project are: An iron ore mine and resource comprising Brockman... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.