This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 11, 2024
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: January 25, 2022
Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...Last updated: January 24, 2022
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...Last updated: November 9, 2020
NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub. The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020. This referral is for ... Read more...Last updated: December 3, 2018
Wesfarmers Chemicals, Energy & Fertilisers Limited proposes to construct and operate a methanol plant with a production capacity of approximately 5,000 tonnes per day ( tpd ) on Site E within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. The proposal is adjacent to the Murujuga National Park. The proposal would result in the disturbance of approximately 75 hectares within Site E. Read more...Last updated: October 12, 2005
The proposal is to construct an ammonia–urea plant on the Burrup Peninsula. The plant will have a production capacity of 2300 tonnes/day (t/d) of ammonia and 3500 t/d of urea. The plant and associated infrastructure will be composed of: a natural gas supply pipeline from the North West Shelf Liquefied Natural Gas (LNG) Plant (to be located in a multi-user service corridor); ammonia plant; urea plant; fluid bed granulation plant; seawater desalination, treatment and storage; internal power... Read more...Last updated: September 18, 2000
Proposal to construct a gas to synthetics plant on the Burrup peninsula. Read more...