This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 3, 2005
The proponent wishes to split the original proposal into two proposals, an ammonia plant and a urea plant. The approval to split the proposal was granted as a change to the proposal on 12 October 2005 under section 45C of the, Environmental Protection Act 1986, . The split of the proposal is based on commercial grounds and there are no changes to the capacities or other operational characteristics of the proposal as originally approved. The split of the proposal will result in each plant being... Read more...Last updated: June 13, 2005
Wesfarmers Energy Limited proposes to construct and operate the 300MW Collie B Power Station on a site directly adjacent to the existing Collie A Power Station and located approximately 10km east-north-east of Collie. It will be a supercritical coal-fired base-load generation facility with a nominal generating capacity of approximately 300MW. The Collie B Power Station will supply electricity to the South West Interconnected System (SWIS). Read more...