Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (13) Apply Iron Ore filter
  • Infrastructure (8) Apply Infrastructure filter
  • Oil and gas (3) Apply Oil and gas filter
  • Utilities (3) Apply Utilities filter
  • Industrial (2) Apply Industrial filter
  • Land use (2) Apply Land use filter
  • Copper (1) Apply Copper filter
  • Gold (1) Apply Gold filter
  • Nickel (1) Apply Nickel filter

Filter by current status:

  • Ministerial Statement published (16) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (8) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (3) Apply Assessment has been terminated under s40A of the EP Act filter
  • Assessment on Proponent Information – Request for More Information published (1) Apply Assessment on Proponent Information – Request for More Information published filter
  • Response to submission published (1) Apply Response to submission published filter

Filter by preliminary environmental factors:

  • (-) Remove Flora and Vegetation filter Flora and Vegetation
  • (-) Remove Terrestrial Fauna filter Terrestrial Fauna
  • Social Surroundings (16) Apply Social Surroundings filter
  • Inland Waters (9) Apply Inland Waters filter
  • Hydrological Processes (8) Apply Hydrological Processes filter
  • Subterranean Fauna (8) Apply Subterranean Fauna filter
  • 37 (7) Apply 37 filter
  • Inland Waters Environmental Quality (6) Apply Inland Waters Environmental Quality filter
  • Benthic Communities and Habitats (3) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (3) Apply Marine Environmental Quality filter
  • Marine Fauna (3) Apply Marine Fauna filter
  • Terrestrial Environmental Quality (3) Apply Terrestrial Environmental Quality filter
  • Coastal Processes (2) Apply Coastal Processes filter
  • Human Health (2) Apply Human Health filter
  • Landforms (2) Apply Landforms filter
  • 3144 (1) Apply 3144 filter

Filter by Proponent:

  • Atlas Iron Pty. Ltd. (2) Apply Atlas Iron Pty. Ltd. filter
  • Bungaroo South Pty Ltd (2) Apply Bungaroo South Pty Ltd filter
  • Forge Resources Swan Pty Ltd (2) Apply Forge Resources Swan Pty Ltd filter
  • Hamersley Iron Pty Limited (2) Apply Hamersley Iron Pty Limited filter
  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • ACH Minerals Pty Ltd (1) Apply ACH Minerals Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Austral Bricks (WA) Pty Ltd (1) Apply Austral Bricks (WA) Pty Ltd filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • BHP Billiton Nickel West (1) Apply BHP Billiton Nickel West filter
  • Energy Resources Limited (1) Apply Energy Resources Limited filter
  • GrainCorp Liquid Terminals Australia Pty Ltd (1) Apply GrainCorp Liquid Terminals Australia Pty Ltd filter
  • Grange Resources Ltd (1) Apply Grange Resources Ltd filter
  • Main Roads WA (1) Apply Main Roads WA filter
  • Meynell Pty Ltd (1) Apply Meynell Pty Ltd filter
  • Minister for State Development (1) Apply Minister for State Development filter
  • NW Interconnected Power Pty Ltd (1) Apply NW Interconnected Power Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter
  • Roy Hill Iron Ore Pty Ltd (1) Apply Roy Hill Iron Ore Pty Ltd filter
  • Smiths 2014 Pty Ltd (1) Apply Smiths 2014 Pty Ltd filter
  • Subsea 7 Contracting Pty Ltd (1) Apply Subsea 7 Contracting Pty Ltd filter
  • UIL Energy (1) Apply UIL Energy filter
  • Yilgarn Iron Pty Ltd (1) Apply Yilgarn Iron Pty Ltd filter

Filter by region:

  • Pilbara (13) Apply Pilbara filter
  • Perth (4) Apply Perth filter
  • South West (3) Apply South West filter
  • Great Southern (2) Apply Great Southern filter
  • Mid West (2) Apply Mid West filter
  • Wheatbelt (2) Apply Wheatbelt filter
  • Gascoyne (1) Apply Gascoyne filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter
  • Kimberley (1) Apply Kimberley filter

Filter by last updated:

  • (-) Remove 2020 filter 2020
  1. Home
  2. Proposal search
  3. Terrestrial Fauna
  4. 2020
  5. Flora and Vegetation

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

EP371 Laurel Gas Exploration and Appraisal Program

Last updated: December 2, 2020

Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to six wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...

Cardup Brickworks Redevelopment

Last updated: November 30, 2020

Austral Bricks is proposing the redevelopment of the Cardup Brickworks, which includes the expansion of the existing factory, increasing the design capacity from 200,000 to 250,000 tonnes per annum. The site is located in the southern extremity of Byford. Additional ancillary improvements include the installation of a new baghouse scrubber and a new primary crusher located in the floor of the pit. The proposal would include: Expanding the capacity from 200,000 to 250,000 tonnes per annum; New... Read more...

Miralga Creek DSO Project

Last updated: November 23, 2020

Atlas Iron Pty. Ltd (the proponent) propose to develop the Miralga Creek DSO Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 8 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of four to five years. Associated infrastructure will include waste rock dumps. Existing borefield and accommodation... Read more...

Asian Renewable Energy Hub Revised Proposal

Last updated: November 9, 2020

NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub.  The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020.   This referral is for ... Read more...

Roy Hill 1 Iron Ore Mining Stage 2

Last updated: September 30, 2020

Proposal to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline by Roy Hill Iron Ore Pty Ltd (RHIO). Read more...

Subdivision at Goodwood Estate, Lot 9002 (formerly Lot 871) Prowse Road, Capel

Last updated: September 29, 2020

Meynell Pty Ltd intends to subdivide Lot 9002 Prowse Road, Capel to create 70 lots for residential development, associated access roads and a reserve for recreation and drainage. The proposal area is 15.5 hectares (ha) of which approximately 11.5 ha is proposed for development. Read more...

Mt Keith Satellite Project

Last updated: September 16, 2020

BHP Billiton Nickel West (BHPB) proposes to develop the Mt Keith Satellite Project (the proposal), to the existing Mount Keith Mining Operations. The proposal is located approximately 80 km north of Leinster in the Shire of Leonora. The proposal includes clearing of up to 842 hectares of native vegetation (which is also fauna habitat) for two open pits, a Waste Rock Landform and a transport corridor, with minor ancillary infrastructure to support the mining process. Read more...

Smiths Beach Development (S46) [2259]

Last updated: September 14, 2020

Change to condition 2-1 in order to extend the Time Limit for substantial commencement of the proposal. Read more...

Raven 2D Seismic Acquisition Survey

Last updated: September 4, 2020

Energy Resources Limited proposes to undertake a 2D onshore seismic acquisition survey to map the subsurface geology of the area, within petroleum exploration permit 432 in the Shire of Dandaragan. The proposal comprises a total of 125 line kilometres of 2D seismic lines within an area of about 122.6 km2. The proposal will require temporary disturbance of up to 40 hectares of native vegetation to create access lanes for the vibroseis trucks and light vehicles. The proposal is to be undertaken... Read more...

Roe Highway Extension (s46) [2164]

Last updated: August 6, 2020

Section 46 change to conditions - Inquire into the suitability of the implementation conditions and whether any of them should be changed. Read more...

Albany Iron Ore Project - Southdown Magnetite Proposal (s46) [2222]

Last updated: July 23, 2020

Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...

Buckland Project (S46) [2243]

Last updated: July 23, 2020

Change to condition 3 to extend the authorised timeframe for substantial commencement of the proposal by five years, to 12 February 2024. Read more...

Ravensthorpe Gold Project

Last updated: July 21, 2020

ACH Minerals proposes to develop the Kundip Mine Site located approximately 17 km south-east of Ravensthorpe in the Shire of Ravensthorpe. The proposal involves the development and operation of a gold and copper mine including open cut and underground mining, processing facilities, waste rock landforms, a tailings storage facility and associated infrastructure. The project will have an 8 year mine life and a disturbance area of 244.7 hectares including 197.8 hectares of native vegetation within... Read more...

Turee Syncline Iron Ore Project (s46) [2173]

Last updated: July 9, 2020

Change to Condition 3. Extension to Time Limit for Proposal Implementation. Read more...

Mesa H Proposal (Revision to Mesa J Iron Ore Development)

Last updated: July 9, 2020

Robe River Mining Co. Pty Limited (the proponent) proposes to develop the Mesa H deposit to sustain its iron ore production operations within the Robe Valley, Pilbara. The proposal is located approximately 16 km south west of Pannawonica. The proposal would include a total disturbance of 2,200 hectares to develop above and below water table open cut iron ore pits and associated infrastructure, including water management infrastructure. The proposal is located adjacent to the existing Mesa J... Read more...

Learmonth Pipeline Fabrication Facility

Last updated: June 29, 2020

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The onshore pipeline fabrication site and associated infrastructure includes two Bundle tracks (approximately 10 km in length) along which the Bundles will be constructed... Read more...

Parker Range (Mount Caudan) Iron Ore Project

Last updated: June 26, 2020

The proposal is for the development and operation of the Parker Range Project, located in the Mount Caudan section of the Parker Range within the Shire of Yilgarn. It includes the development and operation of an above and below the watertable greenfields iron ore mine and associated infrastructure. An existing gazetted road (Parker Range Road) runs across the ore body. A gazetted bypass road would be required around the proposed mine site requiring approximately 10 ha of clearing. Ore from the... Read more...

Oakajee Deepwater Port, Oakajee, Shire of Chapman Valley (s46) [2171]

Last updated: June 18, 2020

Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...

2D Seismic Acquisition Survey

Last updated: June 3, 2020

UIL Energy Ltd proposes to conduct a 2D seismic survey within exploration permits 447, 488 and 489 near the town of Badgingarra (Shire of Dandaragan). The proposal would involve clearing of up to 24 hectares of native vegetation within a proposal area of 101,813 hectares. Clearing will occur within Badgingarra National Park, Wongonderrah and Twyata Nature Reserve, unallocated Crown Land, road reserves, and private properties. Read more...

Balla Balla Magnetite Mining Project (S46) [2224]

Last updated: May 27, 2020

Changes to conditions 3-1 and 3-2, time limit of authorisation of Ministerial Statement 985 in order to extend the Time Limit of Authorisation. Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.