Last updated: November 25, 2009
The proposal is the industrial subdivision of Lots 300-303 and 14 & 15 Beringarra Avenue, Malaga. The lots total an area of 11.6 hectares (ha). The proposal area is bounded by Victoria Road to the north, the proposed Hepburn Avenue extension to the east, Reid Highway to the south and an existing industrial estate to the west. Lot 300, part of the proposed development, is separated from the other lots by a power line and includes the site of a former scrap metal yard. Read more...Last updated: November 2, 2009
Midland Brick Company Pty Ltd (Midland Brick) referred a proposal to the Environmental Protection Authority (EPA) on 3 May 2002 to indefinitely extend the time limit of its environmental approval for its clay excavation operation at Hallet and Copley Roads, Upper Swan and to expand the environmental approval to include Lot 19 Copley Road, Lots 19, 45 and 46 St Albans Road and Lot 100 Great Northern Highway, Upper Swan for further clay excavation operations. The new areas to be included in the... Read more...Last updated: December 4, 2006
Inquiry under section 46 of the, Environmental Protection Act 1986, on the proposal to develop a residential subdivision in the north-west sector of Herdsman Lake (Floreat Lakes) approved in 1989. Read more...Last updated: October 31, 2006
The proposal involves the construction and operation of an approximately 2.8 million tonnes per annum mineral sands mine and concentrator plant on part Swan Location 128, 354 & 508, Lot 2; part Swan Location 128 & 340, Lot 3; part Swan Location 128, 354, 355, 506, Lot 9; Swan Location 506; portion of each of Swan Locations 354 & 508, Lot 1 and part Swan Location 511 & 536, Lot 7, near the intersection of Brand Highway and Dewar Road, approximately 2.5 kilometres north-west of... Read more...Last updated: July 17, 2006
Proposal by Mr D J & Mrs R Winter to subdivide Lot 1613 Barrett Street, Southern River. Read more...Last updated: May 25, 2006
The proposal is for residential development on the East Clontarf site, approximately 18ha in size. The site is bounded by Manning Road, Centenary Avenue and the Canning River. It is zoned Urban in the Metropolitan Region Scheme (MRS) and Residential in the City of South Perth Town Planning Scheme. The foreshore area adjacent to the proposed development is identified for protection as Bush Forever site 333 and reserved for Parks and Recreation in the MRS. Read more...Last updated: January 25, 2006
Main Roads Western Australia (MRWA), propose to construct an On-ramp from Abernethy Road to Tonkin Highway, Kewdale. This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations as required by Section 44 of the, Environmental Protection Act 1986, to the Minister for the Environment, on the environmental factors relevant to the proposal. Read more...Last updated: December 28, 2005
The proposal is to construct and operate a 23-kilometre pipeline from Kwinana Junction, in Kwinana to Hopelands (between Punrak Road and Henderson Road). This proposal is known as the Southern Looping Project, and comprises loop 10. The proponent has also referred a proposal to construct and operate a 194-kilometre pipeline from Compressor Station 1 south of Karratha, to Compressor Station 9, north of Gingin. This proposal, known as the Northern Looping Project , and comprising loops 1 to 9,... Read more...Last updated: November 25, 2005
The revised proposal is to change the dimensions of the containment cell by reducing the footprint, from 7 ha t o 3.8 ha, and increasing the height, from 25m AHD to 35.5m AHD (approximately 15.5 m above surrounding land). Read more...Last updated: October 5, 2005
CSBP Limited propose to remediate the former Cresco site in Bayswater. There is up to 280,000 m 3 of contaminated soil present on site. The contamination was caused by the disposal of pyritic wastes or cinders, lead chamber washings, sodium bisulphate, den-scrubber effluent, superphosphate and other building wastes during the site’s history. The cinders, sodium bisulphate and den-scrubber effluent were deposited in excavated pits while the other wastes were disposed of on a more random basis.... Read more...Last updated: March 4, 2005
The proposal is to construct and operate the South West Metropolitan Railway from Perth to Mandurah. The proposal includes the establishment of rail infrastructure between Perth and Mandurah with the northern section of the line running from the Perth Central Business District to Anketell tunnel via the Kwinana Freeway. South of the Anketell tunnel, the proposed railway passes through the local government areas of the Town of Kwinana, the City of Rockingham and the City of Mandurah, and... Read more...Last updated: November 25, 2004
Australian Gold Reagents Pty Ltd (AGR) proposes a review of its Ministerial conditions relating to the manufacture, storage and transport of sodium cyanide in order to clarify their intent, remove obsolete or confusing aspects, update standard conditions and consolidate the relevant conditions into one Statement. Read more...Last updated: September 20, 2004
Proposal to subdivide approximately 89 hectares of land being Lot 502 bounded by North Lake, Phoenix and Sudlow Roads and a rail reserve, for industrial and mixed business purposes. The proponent for the proposal is the Western Australian Land Authority trading as LandCorp (LandCorp). Read more...Last updated: June 25, 2004
Proposal by the Water Corporation to construct a Water Treatment Plant in Mundaring and Water Storage Tanks in Sawyers Valley. Read more...Last updated: May 28, 2004
Inquiry under Section 46(3) of the, Environmental Protection Act 1986, on Ridgepoynt Pty Ltd’s (formerly Centurion North West Pty Ltd) proposal to allow a time extension to remediate the Tonkin Park Stage II site in accordance with the Ministerial conditions set out in Statement No. 539 issued on the 24 February 2000. Read more...Last updated: December 3, 2003
Proposal by the Midland Redevelopment Authority (MRA) to remediate 15.5 hectare (ha) of land in the western (Helena West) area of the former Midland Railway Workshop Site in Midland. Read more...Last updated: November 25, 2002
The Midland Redevelopment Authority proposes to remediate 15.5 hectares of land referred to as the Clayton Precinct which comprises the eastern part of the Midland Railway Workshops site located immediately south of the Midland town centre in Midland. The proposal is to remediate the 15.5 hectares identified as Areas B, C and D for the development of a Police Operations Support Facility. Read more...Last updated: October 28, 2002
Proposal by Mr GM & Mrs CM White to subdivide their 24.6 hectare property, Lot 5 Lexia Avenue, Upper Swan into nine rural residential lots of greater than 2 hectares each. Read more...Last updated: October 11, 2002
Mr John Maas (Bullsbrook Turf) proposes to expand the existing turf farm at Lot 8 Raphael Road, Bullsbrook from 12 hectares (ha) to 26 ha. The proposal is within the Ellen Brook catchment. The turf farm has two centre pivot irrigators (pivots 1 and 2) with a combined irrigated area of 26 ha. The proponent currently has 8 ha of turf under pivot 1 and 4 ha of turf under pivot 2. The proposed additional 14 ha of turf will be grown under pivot 2. Read more...