Last updated: June 14, 2022
APA Northern Goldfields Interconnect Pty Ltd proposes to construct and operate the Northern Goldfields Interconnect Pipeline. The 300 mm diameter buried gas pipeline will extend for approximately 580 km, starting from Ambania (50 km east of Geraldton) to 40 km south of Leinster where it will connect into the existing Goldfields Gas Pipeline. The project will connect existing gas assets in the Mid West region with existing gas assets in the Northern Goldfields region. The proposal includes... Read more...Last updated: February 15, 2021
Energy Resources Ltd proposes to undertake 3D (Romanesque) and 2D (Black Cormorant) seismic acquisition surveys to map the subsurface geology of an area within petroleum exploration permits EP 389 (R4), EP 440 (R1), and petroleum production licences L 18 and L 19. The proposal is located within the Shire of Gingin. The Romanesque 3D seismic acquisition survey comprises of 594 line kilometres of seismic lines plus 72 line kilometres of contingent lines. The Black Cormorant 2D seismic... Read more...