Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Iron Ore filter Iron Ore
  • Industrial (1) Apply Industrial filter
  • Infrastructure (1) Apply Infrastructure filter

Filter by current status:

  • Ministerial Statement published (6) Apply Ministerial Statement published filter

Filter by relevant environmental factors:

  • (-) Remove Terrestrial Environmental Quality filter Terrestrial Environmental Quality
  • Flora and Vegetation (4) Apply Flora and Vegetation filter
  • Hydrological Processes (4) Apply Hydrological Processes filter
  • Terrestrial Fauna (4) Apply Terrestrial Fauna filter
  • Social Surroundings (3) Apply Social Surroundings filter
  • Inland Waters Environmental Quality (2) Apply Inland Waters Environmental Quality filter
  • Landforms (2) Apply Landforms filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • 37 (1) Apply 37 filter

Filter by Proponent:

  • Crosslands Resources Ltd (1) Apply Crosslands Resources Ltd filter
  • FI Joint Venture Pty Ltd (FIJV) (1) Apply FI Joint Venture Pty Ltd (FIJV) filter
  • Karara Mining Limited (1) Apply Karara Mining Limited filter
  • Kingstream Resources NL (1) Apply Kingstream Resources NL filter
  • Sinosteel Midwest Corporation Limited (1) Apply Sinosteel Midwest Corporation Limited filter
  • Sinosteel Midwest Management Pty Ltd (1) Apply Sinosteel Midwest Management Pty Ltd filter

Filter by region:

  • (-) Remove Mid West filter Mid West
  1. Home
  2. Proposal search
  3. Mid West
  4. Iron Ore
  5. Terrestrial Environmental Quality

Yogi Magnetite Project

Last updated: November 25, 2024

FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of the magnetite will... Read more...

Weld Range Iron Ore Project (S46) [2205]

Last updated: June 21, 2019

Read more...

Karara Iron Ore Project

Last updated: December 13, 2017

The proposal is to construct and operate a magnetite iron ore mine, processing plant and associated infrastructure, linear infrastructure corridor accommodating the raw water pipeline to the borefield near Mingenew, and access road to Morawa, in the Midwest region of Western Australia. Read more...

Weld Range Iron Ore Project

Last updated: March 12, 2014

The proposal is to construct and operate an iron ore mine and associated infrastructure at Weld Range. Open pit mining would occur above and below the water table and would involve dewatering. Excess water would be discharged to a lined evaporation pond. Read more...

Jack Hills Expansion Project

Last updated: January 9, 2012

The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...

Mid west iron and steel project - Geraldton Steel Plan, Narngulu Industrial Estate

Last updated: October 13, 1997

The proposal is to to increase the production of Kingstream Resources' recently assessed Mid West Iron & Steel Project Geraldton Steel Plant (GSP), at the Narngulu Industrial Estate south-east of Geraldton, from 1.0 Mt/a to 2.4 Mt/a. Changes are also proposed to the product, specifically that slab steel be produced rather than rolled coil, with resulting changes in the requirement for major plant. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.