Proposal to build and operate a Regional Resource Recovery Center on Pt Lot 78 and Pt Lot 85 Bannister Rd, Canning Vale. Read more...Last updated: June 21, 2018
Main Roads Western Australia (MRWA) proposes to construct and maintain a new road from Northwest Coastal Highway (near Karratha), through the Millstream-Chichester National Park (NP), to the Nanutarra-Munjina Road intersection (north of Tom Price). Read more...Last updated: April 3, 2017
The Western Australian Planning Commission and the City of Armadale propose to develop a water-based recreation park incorporating an international rowing course and other facilities including a residential component on land situated on Lake Road in the City of Armadale. Read more...Last updated: August 31, 2016
Austeel Pty Ltd proposes to mine iron ore from the George Palmer Orebody on a pastoral lease about 25km south of Cape Preston. Ore will be fed to a purpose-built process plant to produce up to 13.8 million tonnes per annum of pellet iron and 4.7 million tonnes per annum of direct reduced iron (DRI) and/or hot briquetted iron (HBI). The products will be exported via a new port to be built at Cape Preston and Preston Island. Associated components comprise waste dumps, tailings storage facility,... Read more...Last updated: December 4, 2006
Iluka Resources Ltd (Iluka) has sought to update the 1992 Ministerial Statement 291 to reflect the current operating parameters and licence conditions at the North Capel Synthetic Rutile Plants 1 and 2 site via a review of the conditions and commitments in that Ministerial statement. Accordingly, the Minister for the Environment has requested the Environmental Protection Authority (EPA) to consider and provide advice to him under Section 46(6) of the, Environmental Protection Act 1986 Read more...Last updated: November 25, 2004
Australian Gold Reagents Pty Ltd (AGR) proposes a review of its Ministerial conditions relating to the manufacture, storage and transport of sodium cyanide in order to clarify their intent, remove obsolete or confusing aspects, update standard conditions and consolidate the relevant conditions into one Statement. Read more...Last updated: September 20, 2004
Proposal to subdivide approximately 89 hectares of land being Lot 502 bounded by North Lake, Phoenix and Sudlow Roads and a rail reserve, for industrial and mixed business purposes. The proponent for the proposal is the Western Australian Land Authority trading as LandCorp (LandCorp). Read more...Last updated: May 12, 2003
Cable Sands (WA) Pty Ltd proposal to develop a mineral sands mine in a section of State Forest No.2, near Ludlow. Read more...Last updated: December 6, 2002
Proposal by Hope Downs Management Services Pty Ltd (hereafter referred to as HDMS) to construct a rail line and port facilities to support the development of an iron-ore mine, based on the Hope 1 Deposit. Read more...Last updated: September 18, 2000
Proposal to construct a gas to synthetics plant on the Burrup peninsula. Read more...Last updated: October 29, 1999
Proposal to redevelop the Harvey and Stirling Reservoir system in order to divert an additional quantity of water from the Harvey Basin for the Perth Metropolitan Water Supply Scheme (PMWSS). The proposal involves the construction of a new pipeline from Harris Sam to Stirling Reservoir to enable transfer of water. Read more...Last updated: July 22, 1999
Saracen Properties Pty Ltd propose to construct and operate a brick and tile manufacturing plant in Hazelmere, south of the Midland town center, approximately 16 km north-east of the Perth metropolitan area. Read more...Last updated: June 23, 1992
Swan Portland Cement propose to quarry limestone and construct and operate a quicklime plant in the Nowergup area, approximately 13 km north of Wanneroo. Read more...Last updated: September 12, 1991
Deras (Australia) Pty Ltd (Deras) proposes to establish and operate a 'wet-blue' tannery within the Shire of West Arthur, approximately 14 km north-east of Darkan. The facility would tan up to 220,000 cattle hides per annum using conventional tanning procedures. Hides would be mainly purchased from abattoirs in the south-west. The site would include a receival yard, a parking area, process building (including storage and office areas), a water reservoir and a wastewater treatment and... Read more...Last updated: March 14, 1989
The State Energy Commission is proposing to establish a gas turbine power station at Pinjar, north east of Wanneroo. At the completion of the construction in 1994, the station will comprise eight 35 MW gas turbine units. Read more...