Last updated: February 7, 2014
The Water Corporation of Western Australia proposes to construct, commission, operate and maintain a new wastewater treatment plant (WWTP) on a portion of the C class Crown reserve No. 29778 (Forestry Purposes) on Chugg Street, north-east of the Walpole townsite. That portion of the reserve is predominantly cleared and used as a depot for the Department of Conservation and Land Management. Read more...Last updated: January 7, 2014
The proposal is for processing of mineral and other sands and preparation of synthetic rutile including by-products at the Tronox Chandala processing facility near the town of Muchea. Inquiry under s46 for a review of conditions of Ministerial Statement 412 . Read more...Last updated: June 26, 2013
Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: January 22, 2013
Establishment of an Industrial Park at Meenaar 18 km east of Northam - Inquiry under s46 of the, Environmental Protection Act 1986, to remove the entire implementation conditions and proponent commitments of Ministerial Statement 293. Read more...Last updated: January 22, 2013
The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...Last updated: January 11, 2013
The proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. The proposal includes: Subsea gas trunkline to bring produced hydrocarbons onshore to the LNG and Domgas plants; Product loading facility (PLF); Materials offloading facility (MOF); LNG and Domgas plants; Accommodation facilities;... Read more...Last updated: December 4, 2012
The proposal is for mining of iron ore below the watertable from the Orebody 23 deposit on the Ophthalmia Range, including de-watering operations, approximately 13 kilometres north-east of Newman, Shire of East Pilbara. Read more...Last updated: October 22, 2012
To develop an open-cut vanadium mine and process plant at Barrambie, 75 kilometres north-west of the Sandstone townsite and 116 kilometres south-east of Meekatharra Read more...Last updated: May 30, 2012
The proposal is to clear up to 3.7 hectares of native vegetation for a limestone quarry, to screen the material on-site, re-establish an access road and rehabilitate all of the disturbed areas. Read more...Last updated: April 4, 2012
The proposal is to increase the throughput of iron ore to 85 million tonnes per annum at the Cape Lambert Port operations. Read more...Last updated: March 28, 2012
The original proposal, as set out in the proponent’s PER, comprised four iron ore mines in the Pilbara region, an ore beneficiation plant, a borefield, an accommodation village and 160km of east-west railway connecting to the north-south link to Port Hedland. Since release of the PER, FMG has made several major modifications to the proposal: the proposed mines at Mt Lewin and Mt Nicholas have been excised; the connecting infrastructure to those minesites is not now needed, leading to a change... Read more...Last updated: February 28, 2012
The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...Last updated: January 17, 2012
The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: March 11, 2011
The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...Last updated: February 23, 2011
The proposal is to develop an open-cut lead carbonate mine and processing facilities approximately 30 kilometres west of the Wiluna townsite to produce a lead concentrate. The lead concentrates will be refined at the Wiluna minesite to produce lead metal, or alternatively will be transported by road to the Geraldton Port and exported. Post-assessment changes to the proposal stipulate that the lead carbonate concentrate produced at the mine-site is transported in sealed bags within locked... Read more...Last updated: January 20, 2011
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...Last updated: November 4, 2010
Identification of potential corridors and areas for future installation of water and waste water pipelines and associated infrastructure throughout the southern suburbs of Perth. Read more...