Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (28) Apply Iron Ore filter
  • Infrastructure (24) Apply Infrastructure filter
  • Land use (13) Apply Land use filter
  • Utilities (11) Apply Utilities filter
  • Industrial (9) Apply Industrial filter
  • Waste management (9) Apply Waste management filter
  • Mineral sands (7) Apply Mineral sands filter
  • Oil and gas (7) Apply Oil and gas filter
  • Sand, rock, gravel and clay (7) Apply Sand, rock, gravel and clay filter
  • Gold (6) Apply Gold filter
  • Bauxite (5) Apply Bauxite filter
  • Copper (5) Apply Copper filter
  • Power generation (5) Apply Power generation filter
  • Rare earth elements (5) Apply Rare earth elements filter
  • Salt (5) Apply Salt filter
  • Nickel (3) Apply Nickel filter
  • Lithium (2) Apply Lithium filter
  • Potash (2) Apply Potash filter
  • Manganese (1) Apply Manganese filter
  • Molybdenum (1) Apply Molybdenum filter

Filter by current status:

  • Decision on whether to assess has been published (42) Apply Decision on whether to assess has been published filter
  • Ministerial Statement published (40) Apply Ministerial Statement published filter
  • Assessment has been terminated under s40A of the EP Act (14) Apply Assessment has been terminated under s40A of the EP Act filter
  • Environmental Scoping Document approved (13) Apply Environmental Scoping Document approved filter
  • EPA Report and Recommendations released - appeals open (6) Apply EPA Report and Recommendations released - appeals open filter
  • Assessment on Proponent Information – public submission period closed (4) Apply Assessment on Proponent Information – public submission period closed filter
  • Assessment on Proponent Information – Request for More Information published (4) Apply Assessment on Proponent Information – Request for More Information published filter
  • EPA Report and Recommendations released - appeals closed (4) Apply EPA Report and Recommendations released - appeals closed filter
  • Public Environmental Review period closed (4) Apply Public Environmental Review period closed filter
  • Response to submission published (4) Apply Response to submission published filter
  • Public Environmental Review document in preparation (3) Apply Public Environmental Review document in preparation filter
  • Environmental Review document open for public submissions (2) Apply Environmental Review document open for public submissions filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter
  • Report and recommendations in preparation (1) Apply Report and recommendations in preparation filter

Filter by relevant environmental factors:

  • (-) Remove Inland Waters filter Inland Waters
  • Flora and Vegetation (125) Apply Flora and Vegetation filter
  • Terrestrial Fauna (116) Apply Terrestrial Fauna filter
  • Social Surroundings (108) Apply Social Surroundings filter
  • Terrestrial Environmental Quality (51) Apply Terrestrial Environmental Quality filter
  • Subterranean Fauna (48) Apply Subterranean Fauna filter
  • 3144 (24) Apply 3144 filter
  • 37 (22) Apply 37 filter
  • Marine Environmental Quality (21) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (18) Apply Benthic Communities and Habitats filter
  • Marine Fauna (18) Apply Marine Fauna filter
  • Landforms (16) Apply Landforms filter
  • Coastal Processes (11) Apply Coastal Processes filter
  • Human Health (9) Apply Human Health filter
  • Greenhouse Gas Emissions (6) Apply Greenhouse Gas Emissions filter
  • Air Quality (2) Apply Air Quality filter

Filter by Proponent:

  • BHP Iron Ore Pty Ltd (5) Apply BHP Iron Ore Pty Ltd filter
  • Main Roads Western Australia (5) Apply Main Roads Western Australia filter
  • Alcoa of Australia Limited (3) Apply Alcoa of Australia Limited filter
  • Eastern Metropolitan Regional Council (3) Apply Eastern Metropolitan Regional Council filter
  • Image Resources NL (3) Apply Image Resources NL filter
  • Public Transport Authority of Western Australia (3) Apply Public Transport Authority of Western Australia filter
  • Atlas Iron Pty Ltd (2) Apply Atlas Iron Pty Ltd filter
  • Chichester Metals Pty Ltd (2) Apply Chichester Metals Pty Ltd filter
  • Cleanaway Solid Waste Pty Ltd (2) Apply Cleanaway Solid Waste Pty Ltd filter
  • Leichhardt Industrials Pty Ltd (2) Apply Leichhardt Industrials Pty Ltd filter
  • Main Roads WA (2) Apply Main Roads WA filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • Tellus Holdings Ltd (2) Apply Tellus Holdings Ltd filter
  • Agrimin Limited (1) Apply Agrimin Limited filter
  • Alcoa of Australia Ltd (1) Apply Alcoa of Australia Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Brockman Mining Australia Pty Ltd (1) Apply Brockman Mining Australia Pty Ltd filter
  • City of Busselton (1) Apply City of Busselton filter
  • City of Gosnells (1) Apply City of Gosnells filter
  • Covalent Lithium Pty Ltd (1) Apply Covalent Lithium Pty Ltd filter
  • Doral Mineral Sands Pty Ltd (1) Apply Doral Mineral Sands Pty Ltd filter
  • Forest Products Commission of Western Australia (1) Apply Forest Products Commission of Western Australia filter
  • Forge Resources Swan Pty Ltd (1) Apply Forge Resources Swan Pty Ltd filter
  • Hamersley HMS Pty Limited (1) Apply Hamersley HMS Pty Limited filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Hamersley Iron Pty Limited (a wholly owned subsidiary of Rio Tinto) (1) Apply Hamersley Iron Pty Limited (a wholly owned subsidiary of Rio Tinto) filter
  • Hanson Construction Materials Pty Ltd (1) Apply Hanson Construction Materials Pty Ltd filter
  • Iluka Resources Limited (1) Apply Iluka Resources Limited filter
  • Kalgoorlie Consolidated Gold Mines Pty Ltd (1) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd filter
  • Karara Mining Limited (1) Apply Karara Mining Limited filter
  • Kelliher Bros. (1) Apply Kelliher Bros. filter
  • Mardie Minerals Pty Ltd (1) Apply Mardie Minerals Pty Ltd filter
  • Moly Metals Australia Pty Ltd (1) Apply Moly Metals Australia Pty Ltd filter
  • MRC Graphite Pty Ltd (1) Apply MRC Graphite Pty Ltd filter
  • NW Interconnected Power Pty Ltd (1) Apply NW Interconnected Power Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter
  • Roy Hill Infrastructure Pty Ltd (1) Apply Roy Hill Infrastructure Pty Ltd filter
  • Roy Hill Iron Ore Pty Ltd (1) Apply Roy Hill Iron Ore Pty Ltd filter
  • Sejeki Pty Ltd (1) Apply Sejeki Pty Ltd filter
  • SF Irrigation Cooperative Limited (1) Apply SF Irrigation Cooperative Limited filter
  • Shire of Ashburton (1) Apply Shire of Ashburton filter
  • Shire of Broome (1) Apply Shire of Broome filter
  • Sino Iron Pty Ltd and Korean Steel Pty Ltd (1) Apply Sino Iron Pty Ltd and Korean Steel Pty Ltd filter
  • South32 Worsley Alumina Pty Ltd (1) Apply South32 Worsley Alumina Pty Ltd filter
  • Southern Ports Authority (1) Apply Southern Ports Authority filter
  • Technology Metals Australia Limited (1) Apply Technology Metals Australia Limited filter
  • Tronox Management Pty Ltd (1) Apply Tronox Management Pty Ltd filter
  • Wasterock Pty Ltd; Hazelland Pty Ltd (1) Apply Wasterock Pty Ltd; Hazelland Pty Ltd filter
  • Water Corporation (1) Apply Water Corporation filter

Filter by region:

  • Pilbara (45) Apply Pilbara filter
  • Perth (36) Apply Perth filter
  • Mid West (18) Apply Mid West filter
  • South West (16) Apply South West filter
  • Goldfields Esperance (9) Apply Goldfields Esperance filter
  • Kimberley (6) Apply Kimberley filter
  • Peel (6) Apply Peel filter
  • Wheatbelt (4) Apply Wheatbelt filter
  • Gascoyne (3) Apply Gascoyne filter
  • Great Southern (2) Apply Great Southern filter
  1. Home
  2. Proposal search
  3. Inland Waters

Sandy Ridge Facility (S46) [2241]

Last updated: September 24, 2020

Change to implementation conditions relating to financial assurance requirements. Read more...

Albany Iron Ore Project - Southdown Magnetite Proposal (s46) [2222]

Last updated: July 23, 2020

Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...

Chlor-Alkali Plant (S46) [2236]

Last updated: July 21, 2020

Changes to Environmental Commitment 2.2.1 related to condition 1 and condition 3, in order to change the authorised storage capacity of chlorine at the proposed site. Read more...

Red Hill Waste Management Facility Extension (S46) [2244]

Last updated: July 1, 2020

Change to Commitment 7.7 (Monitoring) of Condition 1 (Proponent Commitments) Read more...

Learmonth Pipeline Fabrication Facility

Last updated: June 29, 2020

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The onshore pipeline fabrication site and associated infrastructure includes two Bundle tracks (approximately 10 km in length) along which the Bundles will be constructed... Read more...

Balla Balla Magnetite Mining Project (S46) [2224]

Last updated: May 27, 2020

Changes to conditions 3-1 and 3-2, time limit of authorisation of Ministerial Statement 985 in order to extend the Time Limit of Authorisation. Read more...

Hazelmere Resource Recovery Park Community Recycling Centre and Waste Transfer Station

Last updated: April 14, 2020

Eastern Metropolitan Regional Council propose to construct and operate a Community Recycling Centre (CRC) and Waste Transfer Station (WTS) within the existing Hazelmere Resource Recovery Park, at Lots 814, 100 and 301 Lakes Road Hazelmere, in the City of Swan. The CRC would be accepting a range of materials for reuse, recycling and disposal from community members, while the WTS would provide for the short-term storage capacity for consolidation of various waste streams including refuse and food... Read more...

West Pilbara Iron Ore Project Stage 2 - Hardey Proposal (s46) [2182]

Last updated: March 17, 2020

Changes to conditions 3-1 and 3-2 in order to extend the Time Limit for Proposal Implementation. Read more...

Jimblebar Optimisation Project

Last updated: March 17, 2020

The Jimblebar Optimisation Project is a revision of the existing Jimblebar Iron Ore Mine approved under Ministerial Statements 683, 809 and 857. The Revised Proposal is for mining operations at Jimblebar, located approximately 40 km east of the town of Newman. Mining of iron ore deposits will be undertaken above and below the water table. Mining operations will include open pits, overburden storage areas and the construction and operation of associated mine, processing and rail infrastructure.... Read more...

Corunna Downs Project

Last updated: March 12, 2020

Atlas Iron Pty. Ltd (the proponent) propose to develop the Corunna Downs Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 23.3 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of 6 years. Associated infrastructure will include waste rock dumps, a mine operation centre, borefield and... Read more...

Kwinana Bulk Liquid Terminal

Last updated: February 10, 2020

GrainCorp Liquid Terminals Australia Pty Ltd proposes to construct and operate a bulk liquids terminal at Lot 108 Kwinana Beach Road, Kwinana Beach within the Kwinana Strategic Industrial Area. The proposal would involve disturbance of approximately 2.7 hectares and site activities include the transfer and storage of bulk liquids including urea ammonium nitrate liquid fertiliser solution, tallow, vegetable and used cooking oils, industrial solvent, and caustic soda 33%. Read more...

Barrambie Vanadium Project (s46) [2207]

Last updated: November 22, 2019

Changes to conditions 3-1 and 3-2 of Ministerial Statement 911 in order to extend the time limit of proposal implementation. Read more...

Perth-Darwin National Highway (Swan Valley section) (s46) [2188]

Last updated: November 20, 2019

Remove reference to Claypans of the Swan Coastal Plain and remove requirement to vest land with the Conservation and Parks Commission. Read more...

Dongara Titanium Minerals Project (s46) [2217]

Last updated: November 18, 2019

Changes to Condition 3 of Ministerial Statement 953 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...

Tonkin Highway, Guildford Road to Great Eastern Highway Upgrade

Last updated: October 28, 2019

The Commissioner of Main Roads is proposing to upgrade the section of Tonkin Highway between Guildford Road (Bayswater) and the Great Eastern Highway (Belmont). The key components of the project are: construction and operation of two new bridges over the Swan River road widening, reconfiguration, and modification of existing interchanges construction and operation of on/off ramps and collector distributor roads connectivity of the principal shared path to and along Tonkin Highway. The proposal... Read more...

Sand and Clay Extraction, 1728 Great Northern Highway, Bullsbrook

Last updated: September 2, 2019

Brikmakers (BGC Australia Pty Ltd) propose to extract clay and sand at Lots 5 and 6 (1728) Great Northern Highway, Bullsbrook. The site was historically used for the grazing of cattle. Therefore, the majority of the site has been previously cleared of vegetation. Several stands of native trees are located mostly to the west of Lot 5 and to the north of Lot 6. The proposal would include the clearing of 7 hectares of native vegetation and excavation of up to 26 metres in depth. Read more...

Cleanaway Banksia Road Landfill – New Tailings Storage Cell

Last updated: July 8, 2019

The proposal involves the construction and commissioning of a new tailings storage cell (Cell 12A) for the storage of lithium processing tailings at the Banksia Road Waste Management Facility (Banksia Road WMF) located at Lot 2 on Plan 65861, Crooked Brook in Western Australia (WA). It is proposed that Cell 12A will have the capacity to contain approximately 522,000 tonnes of tailings. Read more...

Lake Way SOP Demonstration Plant

Last updated: June 24, 2019

Salt Lake Potash proposes to develop the Lake Way SOP Demonstration Plant. The proposal is ocated in and around Lake Way, approximately 25 kilometres south of Wiluna. The proposal will extract and evaporate natural brines to produce up to 50,000 tonnes per year of Sulphate of Potash (SOP). The activities and infrastructure include: On-playa infrastructure – brine extraction trenches; pond infrastructure; and associated pipework. Off-playa infrastructure – processing plant, process water... Read more...

Pivot Irrigation System Research

Last updated: April 15, 2019

The proponent, Kelliher Bros. plan to expand their grass-fed beef production business from 6 weeks a year to year-round grazing. To achieve this, the proponent would like to trial the installation of a single 40 ha centre pivot irrigator for irrigating pasture within an area of Lot 209 Paterson Road, Ravenswood (88 ha). The proposal occurs within the, Environmental Protection Peel Inlet - Harvey Estuary Policy 1992, policy area. Read more...

Dampier to Bunbury Natural Gas Pipeline (DBNGP) to Albemarle Lithium Plant Gas Pipeline Proposal

Last updated: March 5, 2019

DBNGP (WA) Nominees Pty Limited propose to construct 670m of underground natural gas pipeline between the Albemarle Kemerton Plant (a lithium hydroxide manufacturing plant) and the existing Dampier to Bunbury Natural Gas Pipeline.  The proposal is located in Kemerton, approximately 17km north-east of Bunbury and will provide natural gas to the Albemarle Kemerton Plant (Ministerial Statement No. 1085) . The proposed pipeline will be constructed within a 30m wide corridor requiring clearing of 2.... Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.