Last updated: October 15, 2018
Alcoa proposes to expand the Wagerup Refinery through construction of a third production unit. The proposed production increase to approximately 4.7 Mtpa alumina is to be achieved by a combination of new equipment and upgrade of existing equipment in order to achieve an increase in both capacity and efficiency. As the Wagerup Refinery has been subject to previous assessments, this represents a revised proposal pursuant to s 45B of the EP Act. The current maximum production permitted under the... Read more...Last updated: September 25, 2018
Rosslyn Hill Mining Pty Ltd is proposing to expand their operations at Paroo Station to install a hydrometallurgical facility to convert lead carbonate concentrate to lead metal (ingots). The proposal is located 30 km west of Wiluna (Shire of Wiluna). The proposal includes an additional clearing of approximately 400 hectares, and the exportation of the product through the Port of Fremantle. Read more...Last updated: November 24, 2017
Section 46 Change to Conditions withdrawn 24 November 2017. Read more...Last updated: June 18, 2014
The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...Last updated: June 26, 2013
Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: January 22, 2013
Establishment of an Industrial Park at Meenaar 18 km east of Northam - Inquiry under s46 of the, Environmental Protection Act 1986, to remove the entire implementation conditions and proponent commitments of Ministerial Statement 293. Read more...Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: October 31, 2006
The proposal involves the construction and operation of an approximately 2.8 million tonnes per annum mineral sands mine and concentrator plant on part Swan Location 128, 354 & 508, Lot 2; part Swan Location 128 & 340, Lot 3; part Swan Location 128, 354, 355, 506, Lot 9; Swan Location 506; portion of each of Swan Locations 354 & 508, Lot 1 and part Swan Location 511 & 536, Lot 7, near the intersection of Brand Highway and Dewar Road, approximately 2.5 kilometres north-west of... Read more...Last updated: June 13, 2005
Wesfarmers Energy Limited proposes to construct and operate the 300MW Collie B Power Station on a site directly adjacent to the existing Collie A Power Station and located approximately 10km east-north-east of Collie. It will be a supercritical coal-fired base-load generation facility with a nominal generating capacity of approximately 300MW. The Collie B Power Station will supply electricity to the South West Interconnected System (SWIS). Read more...Last updated: December 4, 2003
The Conservation Commission of Western Australia has prepared through the agency of the Department of Conservation and Land Management, a Proposed Forest Management Plan to apply to the Swan, South West and Warren Regions of the Department of Conservation and Land Management during 2004-2013. This is the EPA's assessment of the environmental factors relating to the proposed plan and the Authority's advice and recommendations to the Minister for Environment. Read more...Last updated: May 23, 2003
The proposal is for the construction, operation, and maintainance of a natural gas fired combined cycle gas turbine (CCGT) power plant with a nominal generation capacity of 120 megawatts (MW) on a site located at Part Lot 131 Mason Road, on the southwestern corner of Donaldson Road and Burton Place, off Mason Road, Kwinana. The plant will provide approximately 1,045 gigawatt hours (GWhr) of electricity annually into the South West Interconnected System (SWIS) electricity market. Read more...Last updated: December 6, 2002
Proposal by Hope Downs Management Services Pty Ltd (hereafter referred to as HDMS) to construct a rail line and port facilities to support the development of an iron-ore mine, based on the Hope 1 Deposit. Read more...Last updated: November 18, 2002
The proposal is to construct and operate a commercial scale HIsmelt Process Plant at Kwinana in Western Australia. The plant will be located at the site currently occupied by the existing HIsmelt Research and Development Facility (HRDF) within the northern portion of the Kwinana Industrial Area (KIA), 40km south of Perth. The Stage 1 plant will initially produce around 820,000 tonnes per annum of pig iron. If the Stage 1 plant is found to be technically and commercially viable, the proponent... Read more...Last updated: February 6, 2002
Proposal by the Midland Redevelopment Authority (MRA) to remediate 22 hectare (ha) of land which includes a portion of the former Midland Railway Workshop Site (Area E) within the Clayton Precinct, Clayton Street road extension and the Helena Street and Viveash Road rail crossings outside of the Clayton Precinct in Midland. Read more...Last updated: February 6, 2002
The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the management component. See... Read more...