Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (2) Apply Infrastructure filter
  • Iron Ore (1) Apply Iron Ore filter
  • Land use (1) Apply Land use filter
  • Power generation (1) Apply Power generation filter
  • Utilities (1) Apply Utilities filter

Filter by current status:

  • (-) Remove Assessment has been terminated under s40A of the EP Act filter Assessment has been terminated under s40A of the EP Act

Filter by relevant environmental factors:

  • (-) Remove Subterranean Fauna filter Subterranean Fauna
  • Flora and Vegetation (6) Apply Flora and Vegetation filter
  • Terrestrial Fauna (6) Apply Terrestrial Fauna filter
  • Social Surroundings (5) Apply Social Surroundings filter
  • Benthic Communities and Habitats (2) Apply Benthic Communities and Habitats filter
  • Hydrological Processes (2) Apply Hydrological Processes filter
  • Inland Waters (2) Apply Inland Waters filter
  • Inland Waters Environmental Quality (2) Apply Inland Waters Environmental Quality filter
  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • 37 (1) Apply 37 filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Main Roads Western Australia (1) Apply Main Roads Western Australia filter
  • Pilbara Energy (Generation) Pty Ltd (1) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Shire of Exmouth and Greenough Holdings Pty Ltd (1) Apply Shire of Exmouth and Greenough Holdings Pty Ltd filter
  • Subsea 7 Australia Contracting PTY LTD (1) Apply Subsea 7 Australia Contracting PTY LTD filter
  • WA Offshore Windfarm Pty Ltd (1) Apply WA Offshore Windfarm Pty Ltd filter

Filter by region:

  • Pilbara (3) Apply Pilbara filter
  • Gascoyne (2) Apply Gascoyne filter
  • South West (1) Apply South West filter
  1. Home
  2. Proposal search
  3. Subterranean Fauna
  4. Assessment has been terminated under s40A of the EP Act

WA Offshore Windfarm Project

Last updated: December 19, 2024

WA Offshore Windfarm Pty Ltd is proposing the construction, operation and decommissioning of the Western Australian Offshore Windfarm project. The project will be located approximately 5.5 km off the coast between Preston Beach and Myalup and will have a generation capacity of up to 300 MW. The Project will comprise up to 37 offshore wind turbine generators (WTGs) with supporting offshore and onshore electrical assets to transfer energy generated by the windfarm to the existing electricity... Read more...

Uaroo Renewable Energy Hub

Last updated: October 18, 2023

Pilbara Energy (Generation) Pty Ltd proposes to construct and operate the Uaroo Renewable Energy Hub on the Uaroo and Emu Creek Pastoral Stations located 120 kilometres south of Onslow, in the Pilbara region of Western Australia. The proposal is to construct and operate a renewable energy generation hub to power Fortescue Metals Group Limited’s mining operations in the Pilbara. The proposal will generate electricity (up to 5.4 gigawatts) from up to 340 wind turbine generators and a solar farm.... Read more...

Yardie Creek Road Realignment Project

Last updated: January 18, 2023

The proposal is to realign a 2 - 3 kilometre (km) section of Yardie Creek Road, Shire of Exmouth. The realignment will be about 1 km south of the existing road and to the south of the Vlamingh Head Lighthouse and Ningaloo Lighthouse Holiday Park. A new southern access road to Vlamingh Head Lighthouse is also proposed. The resulting road will be a 9 m pavement with associated drains, culverts and safety barriers where required. The alignment and design of the road is yet to be finalised with... Read more...

Brockman Syncline 4 Iron Ore Project – Marra Mambas Proposal

Last updated: April 6, 2020

Hamersley Iron Pty Limited propose to expand its existing Brockman 4 Syncline Iron Ore Mine. The expansion would include further clearing of up to 4,800 hectares and expand its current development envelope by 2,567 hectares. Additional dewatering would also take place resulting in dewater discharge extending further along Boolgeeda Creek by nine kilometres. Read more...

Learmonth Bundle Site

Last updated: May 15, 2019

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...

Special Residential Development, Lyndon locations 222 and 223, Exmouth

Last updated: September 20, 1996

The proposal is to develop for special residential purposes Lyndon locations 222 and 223, approximately 10 kilometres south of Exmouth. The subject land is on the eastern shoreline of the Cape Range peninsula immediately inland of the coastal dunes and approximately 10 kilometres south of Exmouth. It is proposed to subdivide the land into 177 special residential lots, ranging in area from approximately 0.4 to 3.4 hectares. The EPA's report was released. The WAPC refused the planning... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.