Last updated: December 19, 2024
WA Offshore Windfarm Pty Ltd is proposing the construction, operation and decommissioning of the Western Australian Offshore Windfarm project. The project will be located approximately 5.5 km off the coast between Preston Beach and Myalup and will have a generation capacity of up to 300 MW. The Project will comprise up to 37 offshore wind turbine generators (WTGs) with supporting offshore and onshore electrical assets to transfer energy generated by the windfarm to the existing electricity... Read more...Last updated: October 18, 2023
Pilbara Energy (Generation) Pty Ltd proposes to construct and operate the Uaroo Renewable Energy Hub on the Uaroo and Emu Creek Pastoral Stations located 120 kilometres south of Onslow, in the Pilbara region of Western Australia. The proposal is to construct and operate a renewable energy generation hub to power Fortescue Metals Group Limited’s mining operations in the Pilbara. The proposal will generate electricity (up to 5.4 gigawatts) from up to 340 wind turbine generators and a solar farm.... Read more...Last updated: January 18, 2023
The proposal is to realign a 2 - 3 kilometre (km) section of Yardie Creek Road, Shire of Exmouth. The realignment will be about 1 km south of the existing road and to the south of the Vlamingh Head Lighthouse and Ningaloo Lighthouse Holiday Park. A new southern access road to Vlamingh Head Lighthouse is also proposed. The resulting road will be a 9 m pavement with associated drains, culverts and safety barriers where required. The alignment and design of the road is yet to be finalised with... Read more...Last updated: April 6, 2020
Hamersley Iron Pty Limited propose to expand its existing Brockman 4 Syncline Iron Ore Mine. The expansion would include further clearing of up to 4,800 hectares and expand its current development envelope by 2,567 hectares. Additional dewatering would also take place resulting in dewater discharge extending further along Boolgeeda Creek by nine kilometres. Read more...Last updated: May 15, 2019
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...Last updated: September 20, 1996
The proposal is to develop for special residential purposes Lyndon locations 222 and 223, approximately 10 kilometres south of Exmouth. The subject land is on the eastern shoreline of the Cape Range peninsula immediately inland of the coastal dunes and approximately 10 kilometres south of Exmouth. It is proposed to subdivide the land into 177 special residential lots, ranging in area from approximately 0.4 to 3.4 hectares. The EPA's report was released. The WAPC refused the planning... Read more...