Last updated: October 5, 2020
CMC proposes to construct and operate a barge loading/unloading facility (Derby barge facility) within the Port of Derby, immediately to the north of the existing Derby jetty. The proposal would require a total disturbance of 3.5 hectares(ha), which includes 1.66 ha of land reclamation and 1.84 ha harbour basin and dredging to a depth of -1.0 metre Australian Height Datum (AHD). The proposed facility would include a purpose-built barge loading/unloading facility, associated servicing (... Read more...Last updated: July 13, 2020
The Commonwealth Department of Defence proposes to establish two underwater training ranges (UTR) to facilitate ongoing training of Defence personnel in underwater demolition operations. The key activity during training is the detonation of small volumes (up to 5 kilograms) of explosives. The location of the two proposed UTRs are in Western Australian State waters, currently used as military training exercise areas. One proposed UTR is adjacent to Campbell Barracks, approximately 10km west of... Read more...Last updated: June 29, 2020
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The onshore pipeline fabrication site and associated infrastructure includes two Bundle tracks (approximately 10 km in length) along which the Bundles will be constructed... Read more...Last updated: June 18, 2020
Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...Last updated: April 20, 2020
The Department of Transport is proposing to construct and operate the Port Hedland Spoilbank Marina Proposal, including marine and land-based components within the Town of Port Hedland, Pilbara, WA. The Proposal includes: marina basin, mooring facilities (up to 80 pens), boat launching area, sand trap and entrance channel capital dredging works resulting in up to 900,000 cubic metres (m3) of dredge spoil and dredged to a maximum depth of -2m chart datum (-6m AHD). Dredge spoil will be used... Read more...Last updated: January 20, 2020
The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions in Ministerial Statement 945 relating to Forge Resources Swan Pty Ltd’s Balla Balla Export Facilities proposal. Read more...Last updated: January 6, 2020
The City of Joondalup proposes to develop a recreational, residential, boating and tourist development, referred to as the Ocean Reef Marina Development at Ocean Reef, Western Australia. The Development is located in the Ocean Reef locality, approximately 29 km from the Perth central area. The Development is within the City and includes the existing Ocean Reef Boat Harbour. Read more...Last updated: November 25, 2019
The Western Australian Water Corporation is proposing to construct the Perth Seawater Desalination Plant 2 (PSDP 2) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The PSDP2 Proposal will be located within the Kwinana Industrial Area, approximately 38 km south of the Perth Metropolitan Area, on Lot 1864, Riseley Road in Naval Base. PSDP2 will be developed in two stages (each with a... Read more...Last updated: June 10, 2019
The City of Albany (CoA) proposes to construct an artificial surfing reef (ASR) at Middleton Beach, southern Western Australia. The proposed ASR will be built at the southern end of the beach with the aim of enhancing the recreational surfing conditions for local residents and tourists. The ASR will be designed to target beginner-intermediate surfers. Read more...Last updated: May 15, 2019
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...Last updated: March 6, 2019
Onslow Marine Support Base Pty Ltd is proposing to modify and extend the Beadon Creek harbour approach channel, turning basin and berth pocket as part of Stage 2 of the Onslow Marine Support Base (OMSB) proposal. The proposed capital dredging will enable offshore supply vessels to access the newly constructed OMSB land-backed wharf facility (Stage 1) within the Beadon Creek Maritime Facility. 930,000 cubic metres of dredge material will be disposed of onshore to a 44 hectare Dredge material... Read more...Last updated: January 17, 2019
The proposal is to undertake a trial of the SMART drumlines as a non-lethal shark hazard mitigation tool in Western Australian conditions. In doing so, it is proposed to catch, tag, relocate and release white sharks. The proposal is located in waters offshore from Gracetown (offshore from Shire of Augusta Margaret River), in the Ngari Capes Marine Park. The duration of the trial will be for 15 months. Where possible, the proposed WA SMART drumline project has been aligned with the NSW SMART... Read more...Last updated: September 10, 2018
Harvest Road Export Pty Ltd is proposing to undertake a two year trial of rock oyster aquaculture at nine sites within the Wooramel Bank, situated along the eastern shoreline of Shark Bay, in the Gascoyne Region. The Wooramel Bank forms part of the Shark Bay Marine Park and World Heritage area. The trial project comprises of nine small sites along a 40 kilometre length of the Wooramel Bank. Seven sites will have intertidal culture systems of oyster baskets held on longlines such that baskets... Read more...Last updated: May 14, 2018
Kimberley Ports Authority (KPA) is seeking to improve accessibility to the Port of Broome, situated in West Roebuck Bay, approximately 5 kilometres south west of the township of Broome. Larger vessels entering the Port, such as cruise ships, have limited access windows due to the large tidal range (10m), presence of channel rock and high spots (shoals) in the access channel. In recognition of the access constraints and the growing tourism industry in Broome, the Department of Primary Industries... Read more...Last updated: May 14, 2018
Section 46 extension to the Time Limit for Authorisation for substantial commencement. Read more...Last updated: July 17, 2017
The Department of Fisheries, on behalf of the Minister for Fisheries proposes to create an ‘Aquaculture Development Zone’ to provide a management precinct for prospective future aquaculture proposals within State Waters, approximately 75 kilometres west of Geraldton within the Fish Habitat Protection Area of the Abrolhos Islands. The strategic proposal area has been selected by the proponent to maximise suitability for marine finfish aquaculture, and minimise potential impacts on existing... Read more...Last updated: March 7, 2017
The Department of Transport proposes to undertake maintenance and improvement works to the Casuarina Causeway located in Bunbury WA. The proposal includes the refurbishment and realignment of the revetment (including a 0.08 ha increase in the causeway footprint), installation of upgraded services, road works, drainage and landscaping. A multi-purpose building (including ablutions) and fishing/viewing platforms are also included as provisional items. Read more...Last updated: December 21, 2016
Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...Last updated: December 7, 2016
The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...