Remove reference to Claypans of the Swan Coastal Plain and remove requirement to vest land with the Conservation and Parks Commission. Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: August 21, 2002
The proposal is to build a transmission line with a maximum capacity of 330 kV from the Pinjar gas turbine station to the Cataby substation. The transmission line, which is primarily lattice tower construction up to 60 m high, traverses State Forest 65 South (Gnangara Park), Bush Forever Site 380, Gingin Stock Route Nature Reserve, State Forest 65 North and private property. The proposed line route is approximately 123 km long and involves the permanent clearing of up to approximately 2.9 ha of... Read more...Last updated: November 14, 2001
The proposal involves the construction and operation of a road/rail corridor, and associated infrastructure, to provide direct access to the Port of Geraldton from the Geraldton-Mt Magnet Road, Walkaway Road and North West Coastal Highway. The implementation of this proposal would allow removal of the current rail line along the city foreshore, allowing redevelopment of this area, and remove existing social and environmental effects associated with this rail line alignment through Geraldton and... Read more...Last updated: April 19, 2000
Inquiry under section 46 of the Environmental Protection Act 1986 to extend the time limit of the environmental approval for the Great Eastern Highway Northam bypass. Read more...Last updated: March 27, 1998
The proposal is for a 33 kilometre coastal road linking the town-sites of Cervantes and Jurien. Read more...Last updated: July 13, 1994
The Great Eastern Highway presently runs through the Town of Northam.This current alignment has inherent problems for local traffic in terms of congestion and the frequency of accidents. Further problems include noise and visual pollution caused by traffic, particularly heavy vehicles. To alleviate these problems, three different alignments around the town have been put forward by Main Roads Western Australia for environmental impact assessment. Read more...Last updated: January 24, 1994
This proposal by the Water Authority of Western Australia is to harvest and store water from a large, high granite outcrop known as Mt Hampton. Mt Hampton is located in a reserve for the purpose of "Water and Conservation of Flora and Fauna" about 60 km south-west of Southern Cross. The proponent has endeavoured to demonstrate to the Environmental Protection Authority that this proposal can be implemented without a significant impact to, or reduction of, conservation values of both... Read more...