Last updated: May 17, 2021
Doral Mineral Sands Pty Ltd is proposing to develop and operate a mineral sands deposit approximately 11 kilometres southeast of Busselton. The proposal includes the development of mine pits and associated infrastructure, wet concentration processing plant, solar evaporation ponds, groundwater abstraction and water management infrastructure and process water pond. The proposal would include a total disturbance of 453.34 hectares within a development envelope of 924.8 hectares. The majority of... Read more...Last updated: December 10, 2019
The proposal is to develop, mine, rehabilitate and decommission the Yoongarillup Mineral Sands Project. The proposal is located approximately 17 kilometres south east of Busselton. The proposal includes the construction of associated mine infrastructure (offices, workshops, laydown area, roads, and ore processing facilities), the backfilling of mined pits and the rehabilitation and decommissioning of disturbed areas. Read more...Last updated: June 17, 2015
To rehabilitate the BHP Titanium Minerals Beenup Project Area located 17 km north-east of Augusta in the Shire of Augusta-Margaret River. Read more...Last updated: March 25, 2015
Inquiry under s46 regarding changing the implementation conditions of Ministerial Statement 799 . Read more...Last updated: August 28, 2014
The proposal is to rehabilitate the Beenup Titanium Minerals Project Area located 17km north-east of Augusta in the Shire of Augusta-Margaret River. The Beenup Rehabilitation Project is located on retained portions of Mining Leases 70/574 and 70/575. Inquiry under s46 to amend Ministerial Statement 140 . Read more...Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: August 13, 2009
The proposal is to mine the Tutunup South Mineral Sands Project located approximately 15 kilometres southeast of Busselton on Lots 2, 1827 and 1828 and part of Lots 441, 442, 1268, 1813, 1829 and part of Crown Reserve 22455, Hithergreen and part of State Forest 33 Yoganup. Mining is to extend approximately 15 metres below ground level and will require dewatering. Read more...Last updated: January 23, 2007
The Cloverdale Mineral Sands proposal, located approximately 190km south of Perth in the Shires of Busselton and Capel, consists of two strands of heavy mineral deposits, 4.5km long. The proposal involves the progressive mining of approximately 3.5 million tonnes of resource, with an average grade of 18% heavy mineral concentrate (HMC), over the two-year life of the mine. The Cloverdale proposal area lies parallel and adjacent to the existing Yoganup West and Yoganup mine sites. The major... Read more...Last updated: July 20, 2000
Proposal by Cable Sands (WA) Pty Ltd to mine mineral sands and relocate an existing rubbish tip in a portion of "C" Class Reserve 31900 which is vested in the Shire of Harvey for the purpose of sand extraction and rubbish disposal. Read more...Last updated: July 23, 1997
The approved proposal is to mine and process an average of 271,000 tonnes of heavy mineral concentrate per year. The concentrate is then trucked from the mine to Bunbury via Black Point Road, Stewart Road and the Vasse and Bussell Highways. The approved trucking regime is for a maximum 56 truck trips per week day. Weekend and public holiday transport requires prior approval of the Shire of Nannup, Cable Sands currently implement a trucking regime involving 44 truck trips (full plus empty) per... Read more...Last updated: February 11, 1992
The proposal is to continue current mining of the orebody at Wonnerup, south of the mouth of the Wonnerup Inlet. The orebody contains heavy mineral sands and tailings remaining from mining done by another company in the 1960s. Cleanup work on the tailings remaining from the previous mining operation began in 1989 and is expected to be completed by March 1992. The proposal to mine adjacent to the existing operations would extend the mine life up to 12 months, with land restoration and... Read more...Last updated: January 10, 1992
The proposal is for an exploration programme to explore for mineral sands and to compile geo-scientific data using geophysical, geological and drilling techniques at locations throughout the length and breadth of the D'Entrecasteaux National Park. The area has been explored from the air using remote sensing geophysical techniques, such as airborne magnetometer surveys, and a number of magnetic anomalies, which may represent mineral sands deposits, have been identified. Read more...Last updated: May 24, 1991
The proposal is to mine about 50ha of farmland per year, by dredging, to produce 500,000 tonnes of heavy minerals annually, for at least 20 years. The dredge would float on the natural watertable surface and reach to the bottom of the deposit without the need to raise or lower the water table. Minerals would be separated from the ore in a wet concentrator floating behind the dredge and by dry concentration at a dry mill at the north of the site. Sand and fine tailings would be returned to the... Read more...Last updated: July 20, 1990
The proposal is to extract about 3.7 million tonnes of ore from about 30 hectares of land at Jangardup each year, to produce 271,000 tonnes of heavy mineral concentrate for trucking to Bunbury annually. The proposed mine life is eight years. Mining would be by a floating dredge feeding a wet separator. On average, some 56 truck trips (28 full, 28 return) per day would be required to transport the product to Bunbury. Read more...Last updated: September 18, 1989
Cable Sands (WA) Pty Ltd has submitted a proposal to mine a deposit of mineral sands approximately 5km to the east of Busselton, near the junction of Vasse and Bussell Highways. Read more...Last updated: October 12, 1988
The proposal is to mine heavy mineral sands, together with Cable Sands (WA) Ply Ltd, from the beach and primary dune at Minninup Beach, Western Australia. The proposed mine site is on the Geographe Bay coastline approximately 10 kilometres south of Bunbury. Immediately to the east of the proposed mining area Cable Sands (WA) Ply Ltd has been mining the secondary dune system since August 1986. The proposed mining operations on the beach and foredune would be carried out by Cable Sands as an... Read more...