Last updated: June 29, 2017
The proposal is for the expansion of the Monkey Mia Dolphin Resort, incorporating both construction and operation. There are three primary components to the proposal: increasing the capacity of the Resort from approximately 600 to 1200 guests per night through an increase from its current area of 3.74 hectares (ha) up to 6.84 ha; developing a new staff accommodation precinct of 2.3 ha immediately to the west of the existing Resort area, incorporating accommodation, recreational facilities and... Read more...Last updated: June 22, 2017
Proposal by BHP Iron Ore Pty Ltd to develop 14 iron ore deposits at Mining Area C-Northern Flank, 100 km north west of Newman. Read more...Last updated: June 6, 2017
The proposal is to construct and operate a freeway-standard dual carriageway between the Reid Highway/Tonkin Highway junction and the Great Northern Highway at Muchea. Read more...Last updated: April 3, 2017
The Western Australian Planning Commission and the City of Armadale propose to develop a water-based recreation park incorporating an international rowing course and other facilities including a residential component on land situated on Lake Road in the City of Armadale. Read more...Last updated: February 6, 2017
The Water Corporation proposes the construction and operation of the Balannup Pressure Main, a 4.5 km wastewater pressure main from the Collared Street Pump Station to the Waterworks Road Pump Station in Armadale. Read more...Last updated: January 25, 2017
The proponent proposes to extend its existing Yilgarn mining operations to include the Koolyanobbing Range F Deposit (the proposal), located on the southern Koolyanobbing Range, approximately 50 kilometres (km) north-east of the town of Southern Cross. Read more...Last updated: January 25, 2017
The proposal involves the development and operation of a 750 Mt iron ore mine, processing facility and associated infrastructure within mining leases M47/1414 and M47/1419. The project area is located approximately 100km north west of Newman in the Fortescue valley. The project area is approximately 15km south of the Fortescue Marsh, a wetland of national significance, and is intersected by Weeli Wolli Creek, which is a major Pilbara drainage system that discharges to the Marsh. Read more...Last updated: January 16, 2017
The proposal is to mine uranium ore from the Yeelirrie deposit, approximately 70 km south-west of Wiluna, and the construction of associated mine infrastructure, including ore processing facilities, water (includes borefield and corridors) abstraction and reinjection infrastructure, roads, accommodation, offices and workshops, stockpile and laydown areas and evaporation pond. Tailings would be discharged into the mine open pit. Read more...Last updated: January 9, 2017
Toro proposes to revise the Approved Project by developing Millipede and Lake Maitland uranium deposits and developing associated infrastructure. The Proposed Extension would result in the additional direct disturbance of approximately 1,582 hectares (ha) within an additional Development Envelope of approximately 3,891 ha. The Proposed Extension would include open mine pits at Millipede and Lake Maitland, in-pit tailings storage facility (TSF) at Millipede, accommodation village, workshop, run-... Read more...Last updated: December 30, 2016
The proposal is to expand existing open-cut and underground gold mining developments within a defined project area on the surface of Lake Lefroy, approximately 20 kilometres south east of Kambalda. The proposal includes the discharge of dewatering to the lake’s surface and the construction of associated mining infrastructure (including open pits and waste rock dumps). Read more...Last updated: December 21, 2016
Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...Last updated: December 20, 2016
Mineral Resources Limited (the proponent) proposes to construct and operate a Pilbara Bulk Ore Transportation System (BOTS), and associated infrastructure. The BOTS extends 330 kilometres from the Iron Valley mine site tenement boundary (M47/1439) to the Port Hedland Pilbara Port Authority boundary. Read more...Last updated: December 16, 2016
The proposal is to mine four poly-metallic deposits containing commercial concentrations of uranium and to produce uranium oxide concentrate and other metal concentrates including copper, zinc, nickel and cobalt, approximately 240km east-northeast of Kalgoorlie. The proposal also includes the construction of associated mine infrastructure consisting of mine dewatering and reinjection infrastructure (including borefields and pipelines), non-mineralised overburden landforms, run of mine stockpile... Read more...Last updated: December 7, 2016
The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...Last updated: December 5, 2016
The proposal is for a change to BHP Billiton's approved iron ore proposals in the Eastern Ridge area, located approximately three kilometres north-east of Newman. The proponent’s approved iron ore proposals for the Eastern Ridge area are: Orebody 25 Extension Project ( Ministerial Statement 712 , 28 October 2009) for an open cut above and below the water table mine for Pits 1 and 3; Orebody 24/25 Upgrade Project ( Ministerial Statement 834 , 8 July 2010) for an open cut mine above the... Read more...Last updated: December 5, 2016
The proponent, Mount Gibson Mining Limited, proposes to mine hematite ore from the Iron Hill and Iron Hill South Deposits. The Iron Hill Deposits are part of the Mt Gibson Range, which is located approximately 270 kilometres (km) east-south-east of Geraldton. The proposal is located within a 112 hectare (ha) development envelope. The proposal is for the development of two mine pits (20 ha), a waste rock landform (30 ha) and support infrastructure (37 ha), which includes topsoil stockpiles and... Read more...Last updated: November 17, 2016
The proposal is to construct and operate a uranium mine consisting of two deposits Centipede and Lake Way at mining tenements M53/224 and MLA53/1090, located approximately 30 kilometres south and 15 kilometres south-east of Wiluna. Read more...Last updated: November 8, 2016
The proposal is an expansion of an existing approved proposal: Yandicoogina Iron Ore Project ( Ministerial Statement 914 ) to develop iron ore deposits at Junction Central, Junction South East, Junction South West and Oxbow, located in the central Pilbara region of Western Australia, on mining lease 274SA. The proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. Read more...Last updated: October 4, 2016
Life-of-mine proposal to mine iron ore within Mining Leases 270SA and 47/292 at a rate of approximately 45 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site. Inquiry under s46 to amend Ministerial Statement 679, the subject of EPA Report 1166 . Read more...