Last updated: November 27, 2017
Plantrite Nursery has applied to the City of Swan for retrospective planning approval for the expansion of its existing 5 hectare (ha) native plant nursery on Lot 88 Bingham Road Bullsbrook (Lot 88). This expansion is proposed to be completed over two stages totalling 10.67 ha; Stage 1 covering 4.76 ha and Stage 2 covering 5.91 ha. However approximately 2.5 ha of Stage 1 has already been constructed. The expansion will also require a new groundwater abstraction licence. Stage 2 is only proposed... Read more...Last updated: November 20, 2017
Cottesloe Pier Pty Ltd proposes to construct a pier extending off the end of the current Cottesloe groyne. The project design consists of a jetty and boardwalk structure including an underwater observatory, cafe, swimming area and fishing jetty. Read more...Last updated: April 10, 2017
Condition 3-1 of Ministerial Statement 906 requires the proponent to substantially commence the proposal within five years of the date of issue of the Statement (that is, before 1 August 2017). The proposal has not yet substantially commenced. The proponent for the proposal, Point Grey Development Company Pty Ltd, has requested an extension of the Time Limit of Authorisation (now referred to as “Time Limit for Proposal Implementation”) for substantial commencement to be extended to be... Read more...Last updated: January 23, 2017
Request from the Minister of Environment to amend conditions of Ministerial Statement 24. Read more...Last updated: December 8, 2016
The Claremont North East Precinct, located immediately north of the Perth to Fremantle Railway and encompassing the existing Claremont Oval, is proposed to be redeveloped for residential and commercial purposes. Read more...Last updated: December 8, 2016
As part of a broader program of shark hazard mitigation (see details below), the Government of Western Australia is implementing a shark hazard mitigation strategy which involves the deployment of baited drum lines to capture target species of large sharks (the proposal). The proposal involves the deployment of up to 72 baited drum lines and rapid response within marine monitoring areas (MMA) in the metropolitan and the South West regions until 30 April 2014. The proposal commenced on 25... Read more...Last updated: December 8, 2016
The proposal has been referred by Main Roads Western Australia for the assessment of Neerabup Road East and Neerabup Road West only (within the Mitchell Freeway Extension). Stage 1 (Neerabup Road East/West) project includes grade separated interchanges (including road bridges) at Neerabup Road, underpasses at Neerabup Road, and Neerabup Road upgrade from Connolly Drive to Wanneroo Road connection to freeway. Read more...Last updated: December 8, 2016
PMR Quarries Pty Ltd, trading as WA Limestone, proposes to develop a sand and limestone quarry in the McLarty State forest (pine plantation) at Myalup, 8 kilometres south east of Lake Clifton township. Read more...Last updated: December 8, 2016
The Environmental Protection Authority has received a referral for sand mining operations within prospecting licences P 70/1596 and P70/1597. The prospecting licences are proposed to be converted to a mining lease. The proposed sand mining area is located wholly within State Forest 65 (Gnangara pine plantation) which is vested in the Conservation Commission of Western Australia and managed by the Department of Parks and Wildlife. Read more...Last updated: December 8, 2016
BAE Systems Australia Ltd is proposing dredging of approximately 1.3 hectares to -6.0m CD and construction of a 75m long land backed wharf close to the existing shoreline. Dredging is proposed to commence in September 2013 and is estimated to take 4 weeks in duration. Construction of the land backed wharf will take up to 9 months. Read more...Last updated: December 8, 2016
The referral received by the EPA is to develop Lot 701 for residential use. The land is zoned 'Urban' under the Metropolitan Region Scheme and 'Residential' (with a residential density coding of R30) under the City of Cockburn Town Planning Scheme No.3. Lot 701 totals approximately 1.71 hectares, of which Auro Pty Ltd proposes to develop approximately one hectare. The subdivision application proposes 16 residential dwellings and a proposed Public Open Space. Approximately... Read more...Last updated: December 8, 2016
The proposal is to expand the existing Baldivis Sand Quarry Stage 1 operation for approximately three years. The proposal is located within Department of Mines and Petroleum (DMP) mining lease M70/1046 and operates under Department of Environment Regulation (DER) Licence L8176/2007/2 and Department of Water Licence (GWL 162863(2)). The proposal is on Department of Parks and Wildlife managed land (State Forest). The area was previously a pine plantation which was then cleared, burned and... Read more...Last updated: December 7, 2016
Hanson Australia Pty Ltd (‘the proponent’) proposes to develop three sand quarries within the Gnangara Pine Plantation on tenements E70/3279 (Smokebush Hill), E70 - 3275 (Tamega Road) and M70- 1306 (Mulga Road) (‘the proposal’). Smokebush Hill is located in Two Rocks, approximately 55 kilometres (km) north of Per th Central Business District (CBD) . Tamega Road is located in Pinjar, approxi mately 47 km north of Perth CBD. Mulga Road is located in Gnangara, approxi mately 20 km north of Perth... Read more...Last updated: November 30, 2016
The Department of Minerals and Petroleum has referred a Programme of Work application. The application, from Holcim (Australia) Pty Ltd, is to undertake an air core drilling exploration programme on M70/1248 and M70/1250. The exploration site is cleared pine plantation to the East of Lake Jandabup. Read more...Last updated: November 30, 2016
The Site is approximately 16.9 ha and is proposed to be remediated and regenerated. It was previously mined for building and construction sands and was later used as a licensed “inert” landfill. It has been reported that non-approved waste streams were disposed of at the Site. In October 2010 following a compliance inspection the Site was classified “Contaminated – Remediation Required” under Section 13 of the Contaminated Sites Act 2003 The proponent is proposing to redevelop the area by... Read more...Last updated: September 19, 2016
The proposal is to develop a Waste Transfer and Resource Recovery Facility approximately 10 kilometres from Perth at 25 Jackson Street, Bassendean in the Bassendean Industrial Area. The proposal would include: a Materials Recovery Facility (MRF) for the processing of co-mingled recyclables; acceptance, short term stockpiling and baling of source separated recycled commodities; glass crusher for management of waste glass from the MRF; a metal shredder for the processing of metal commodities; a... Read more...Last updated: September 12, 2016
The Commissioner for Main Roads Western Australia proposes to construct and maintain the Ellenbrook Bus Rapid Transit to provide a dedicated busway from the Ellenbrook town centre to Reid Highway. It involves the construction of: approximately 10 kilometres of dedicated busway; grade separations of the busway at road crossings; upgrades of all existing intersections; three bus stations with Park and Ride facilities; realignment of Lord Street from Reid Highway to Youle-Dean Road and from Park... Read more...Last updated: July 18, 2016
Keppel Holdings proposes the development and operation of a mobile concrete batching plant at Lot 105 (No. 2) Clune Street, Bassendean. The proposal site is located within the Bassendean Industrial Area. The proposal includes the construction of buildings and associated car and truck parking. Read more...