Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Oil and gas filter Oil and gas

Filter by current status:

  • (-) Remove Decision on whether to assess has been published filter Decision on whether to assess has been published

Filter by relevant environmental factors:

  • 3144 (2) Apply 3144 filter
  • Flora and Vegetation (1) Apply Flora and Vegetation filter
  • Terrestrial Fauna (1) Apply Terrestrial Fauna filter

Filter by Proponent:

  • AGI Operations Pty Limited (1) Apply AGI Operations Pty Limited filter
  • AWE Limited (1) Apply AWE Limited filter
  • AWE Perth Pty Ltd (1) Apply AWE Perth Pty Ltd filter
  • Energy Resources Ltd (1) Apply Energy Resources Ltd filter
  • MEPAU Perth Basin Pty Ltd (1) Apply MEPAU Perth Basin Pty Ltd filter
  • Norwest Energy NL (1) Apply Norwest Energy NL filter
  • Warrego Energy Pty Ltd (1) Apply Warrego Energy Pty Ltd filter

Filter by region:

  • (-) Remove Mid West filter Mid West
  1. Home
  2. Proposal search
  3. Decision on whether to assess has been published
  4. Mid West
  5. Oil and gas

West Erregulla Processing Plant and Pipeline (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Waitsia Gas Project Stage 2 (s46) [2490]

Last updated: November 25, 2024

Change the implementation conditions relating to greenhouse gas emissions Read more...

Lockyer Conventional Gas Project

Last updated: April 29, 2024

Energy Resources Ltd proposes a conventional gas project, to construct and operate a gas processing plant and pipeline in the Mid-West region of Western Australia, approximately 350 km north of Perth, 25 km east of Dongara and 15 km west of Mingenew. The proposal comprises the construction and operation of a natural gas processing facility with a nominal production capacity of 250 terajoules per day, up to six (6) natural gas production wellheads, and an infield gathering system and... Read more...

Gynatrix-1 Conventional Exploration Drilling Program

Last updated: July 11, 2022

AWE Perth Pty Ltd proposes to undertake a conventional exploration drilling program located south-east of Dongara, Western Australia (WA). The Proposal includes the construction of a single deviated well, immediately adjacent (extending beneath) the Yardanogo Nature Reserve, and within MEPAU’s Production Licence L1. The intent of the Proposal is to evaluate the gas-bearing potential of the Gynatrix prospect by measuring the properties of the Kingia Sandstone and High Cliff Sandstone formations... Read more...

Xanadu-1 Conventional Onshore Oil Well

Last updated: May 22, 2017

In response to matters raised in the 7-day public comments on the referral, the proponent provided the following clarifying information: 1. Proponent consultation with the Shire of Irwin; 2. Rehabilitation Monitoring Report for the Redhill South 01 well site; 3. Proponent response to 7-day public comments. Read more...

West Erregulla 2 Exploration Well

Last updated: December 7, 2016

Warrego Energy Pty Ltd proposes to develop the West Erregulla-2 Exploration Well located approximately 50 kilometres south - east of Dongara. The proposal is a proof of concept (single well). The exploration targets are at depths of 2,000 metres (m) to 5,000m and include geological structures that may yield natural gas. This includes the Dongara tight sandstone which is found below 3,900m and is expected to require hydraulic fracturing. Read more...

Drover - 01 Exploration Well

Last updated: November 18, 2013

The proposal is to carry out test drilling for hydrocarbons near the boundary of Lesueur National Park, inland from Jurien Bay. The proposal would be situated on farmland adjacent to the National Park and the well would be drilled vertically (no deviated or horizontal drilling is proposed) with the surface location of the well approximately 200 metres from the National Park boundary and bottom hole location approximately 350 metres from the National Park boundary. The drilling would be a depth... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.