Information:
Attachment 1 to Statement 999 -
Changes:
- Change the size of the Southern Infrastructure Corridor (SIC) development envelope from 12,003 ha to 5,465 ha. This involves:
- Reduction of the Southern Infrastructure Corridor development envelope by 6,668 hectares (ha).
- Addition of 130 ha to the Southern Infrastructure Corridor development envelope for the re-alignment of the power line and maintenance track.
- Update Figures 1, 2 and 5 and geographic coordinates as defined in Table 2 of Schedule 2.
Change to conditions approved under S45C on 6 September 2017.
Attachment 2 to Statement 999 - Amendment to condition 14-2, approved under S46C on 4 January 2021.
Ministerial Statement File:
Date of approval:
March 10, 2015