Amendment 60 is an omnibus amendment that proposes numerous modifications to the scheme as an interim step to the preparation of a new local planning scheme. The amendment proposes to: introduce rezoning and scheme map modifications; introduce new land use permissibilities (including Service Stations and Renewable Energy Facility); introduce new development provisions; ensure consistency with the Planning and Development (Local Planning Schemes) Regulations 2015 and the addition of supplemental provisions; and amend minor errors and omissions in the Scheme text and maps. The amendment includes transfer of part of the Murujuga National Park on the Burrup Peninsula (the Peninsula) and parts of the Dampier Archipelago Islands (the Islands) from ‘Public purposes – Telecommunications’ reserve, ‘Strategic Industry’, ‘Infrastructure’ and ‘No Zone’ to ‘Conservation, Recreation and Natural Landscapes’.
Local Planning Scheme (LPS) 8 represents an update to the Shire of Ashburton’s (the Shire) existing LPS 7, to ensure consistency with the requirements of the Model Provisions at Schedule 1 of the Planning and Development (Local Planning Schemes) Regulations 2015, the Shire’s Local Planning Strategy, and relevant state planning legislation and policies.
The purpose of this amendment is to rezone Lot 510 Willersdorf Road, Exmouth from the ‘Public Open Space’ reservation to the ‘Special Use 11 (SU11)’ zone and to amend Schedule 4 – Special Use Zones to include SU11 and relevant conditions.
Amendment 1 has been prepared to facilitate the implementation of new precinct structure plans (which are proposed to be concurrently advertised with the amendment) for: Chinatown/Old Broome and Cable Beach. The amendment proposes scheme text changes (including introduction of structure plan requirements and modifications to definitions in the scheme) and also proposes land use zoning and R-code changes within the Chinatown/Old Broome structure plan area.
The amendment proposes to rezone the subject site from ‘Conservation’ and ‘Rural’ to ‘Urban Development’ to provide for the future subdivision and development of the Abbey South precinct. The amendment also proposes to insert ‘Special Provision Area No. 76’ at Schedule 3 of the Scheme, and to amend the Scheme map to remove the ‘Landscape Value Area – Special Control Area’ from the subject site.
The Shire of Harvey has initiated LPS 2 to replace the existing District Planning Scheme 1.
LPS 2 is proposed to replace the existing Local Planning Scheme 1. The changes are predominantly to update the Scheme to align with the Planning and Development Regulations 2015 and to reflect existing land use. The new scheme proposes a number of changes including new zones, rezoning’s, text updates, scheme provision amendments, additional uses to reflect actual land uses and the introduction of several Special Control Areas.
Local Planning Scheme 8 is proposed to replace the existing Town Planning Scheme 7. The changes are predominantly to update the Scheme to align with the Planning and Development Regulations 2015, ensure consistency with the Greater Bunbury Region Scheme and to reflect existing land use. The new scheme proposes a number of changes including new zones, rezonings, text updates, scheme provision amendments, additional uses to reflect actual land uses and the introduction of several Special Control Areas.