Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Uranium (2) Apply Uranium filter
  • Iron Ore (1) Apply Iron Ore filter
  • Molybdenum (1) Apply Molybdenum filter
  • Oil and gas (1) Apply Oil and gas filter
  • Power generation (1) Apply Power generation filter

Filter by current status:

  • Decision on whether to assess has been published (3) Apply Decision on whether to assess has been published filter
  • Ministerial Statement published (2) Apply Ministerial Statement published filter

Filter by relevant environmental factors:

  • (-) Remove Terrestrial Fauna filter Terrestrial Fauna
  • Flora and Vegetation (5) Apply Flora and Vegetation filter
  • Social Surroundings (4) Apply Social Surroundings filter
  • Inland Waters Environmental Quality (3) Apply Inland Waters Environmental Quality filter
  • Human Health (2) Apply Human Health filter
  • Hydrological Processes (2) Apply Hydrological Processes filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • 37 (1) Apply 37 filter
  • Landforms (1) Apply Landforms filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • Cameco Australia Pty Ltd (1) Apply Cameco Australia Pty Ltd filter
  • Norwest Energy NL (1) Apply Norwest Energy NL filter
  • Three Springs Solar Pty Ltd (1) Apply Three Springs Solar Pty Ltd filter
  • Toro Energy Limited (1) Apply Toro Energy Limited filter
  • Tungsten Mining NL (1) Apply Tungsten Mining NL filter
  • Westralian Iron Pty Ltd (1) Apply Westralian Iron Pty Ltd filter

Filter by region:

  • (-) Remove Mid West filter Mid West

Filter by last updated:

  • (-) Remove 2017 filter 2017
  1. Home
  2. Proposal search
  3. Terrestrial Fauna
  4. Mid West
  5. 2017

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Mount Mulgine Project

Last updated: July 27, 2017

Tungsten Mining NL proposes to extract and process tungsten and molybdenum from the Mulgine Hill and Mulgine Trench deposits at Mount Mulgine over a period of 15 years. The proposal is located approximately 15 km north east of Rothsay, within the Shire of Perenjori. The proposal is partially located: on M59/425, which was previously mined for gold as part of the Minjar Gold Mine Project within the former Warriedar pastoral station, which is managed for conservation purposes by the Department of... Read more...

Xanadu-1 Conventional Onshore Oil Well

Last updated: May 22, 2017

In response to matters raised in the 7-day public comments on the referral, the proponent provided the following clarifying information: 1. Proponent consultation with the Shire of Irwin; 2. Rehabilitation Monitoring Report for the Redhill South 01 well site; 3. Proponent response to 7-day public comments. Read more...

Koolanooka South Magnetite Project

Last updated: March 22, 2017

Westralian Iron Pty Ltd proposes to develop three bulk sample pits at Koolanooka South (Figure 1). The project site is located approximately 20 kilometres (km) due east of Morawa and 370 km north of Perth. Bulk sampling is required to assist with future planning and design for the proposed development and to provide sufficient material for a test regime to fully understand the characteristics of the ore to enable an efficient Magnetite processing plant to be designed. The bulk sampling... Read more...

Yeelirrie Uranium Project

Last updated: January 16, 2017

The proposal is to mine uranium ore from the Yeelirrie deposit, approximately 70 km south-west of Wiluna, and the construction of associated mine infrastructure, including ore processing facilities, water (includes borefield and corridors) abstraction and reinjection infrastructure, roads, accommodation, offices and workshops, stockpile and laydown areas and evaporation pond. Tailings would be discharged into the mine open pit. Read more...

Three Springs - Solar Farm

Last updated: January 12, 2017

Three Springs Solar Pty Ltd is proposing to construct and operate a 100MW solar photovoltaic power station on Lots M761-M764 and Lot 50 Bruce Road, approximately 2km north east of the Three Springs Townsite. The sites are predominately cleared farm land and no vegetation clearing is proposed. Read more...

Extension to the Wiluna Uranium Project

Last updated: January 9, 2017

Toro proposes to revise the Approved Project by developing Millipede and Lake Maitland uranium deposits and developing associated infrastructure. The Proposed Extension would result in the additional direct disturbance of approximately 1,582 hectares (ha) within an additional Development Envelope of approximately 3,891 ha. The Proposed Extension would include open mine pits at Millipede and Lake Maitland, in-pit tailings storage facility (TSF) at Millipede, accommodation village, workshop, run-... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.