This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 6, 2020
Changes to conditions 8 (Stage 1 offsets) and 9 (Access to Stage 2 mining area) to allow full ground disturbance access to the Stage 2 mining area based on progress to date, and condition 10 (Stage 2 offsets) in terms of offsetting significant residual impact. Read more...Last updated: January 25, 2017
The proponent proposes to extend its existing Yilgarn mining operations to include the Koolyanobbing Range F Deposit (the proposal), located on the southern Koolyanobbing Range, approximately 50 kilometres (km) north-east of the town of Southern Cross. Read more...Last updated: February 20, 2015
The proposal is to develop the Jackson 4 (J4) deposit and construct and operate an iron ore mine and supporting infrastructure, access track and haul road in the Goldfields region of Western Australia, approximately 60 kilometres north-west of Koolyanobbing. Read more...Last updated: December 15, 2009
The Red October Gold Project is located on the western shore of Lake Carey, 80km south of Laverton. The proposal is to mine approximately 16 million tonnes of ore and associated waste material over a two year period involves development of an open cut gold mine and waste rock dumps on the lake bed and construction of mine infrastructure and borrow pits on Anglefish Island adjacent to the mining pit. Read more...Last updated: June 23, 2006
Proposal to develop the Wallaby Gold Mine. Located on the shore of Lake Carey, a naturally occurring saline wetland approximately 27 km south-west of Laverton. The Wallaby Gold Mine Project includes development of an open cut gold mine, waste rock dumps and infrastructure to support mining on the northern shoreline of the lake. Gold ore produced at the mine will be transported via overland conveyor to an existing processing plant with tailings placed in both an extended and a new tailings... Read more...Last updated: September 14, 2001
The proposal is for a large-scale nickel and cobalt mining and processing operation which will involve the mining and processing of up to 15 million dry tonnes per annum (Mtpa) of lateritic ore to produce approximately 60,000 tonnes per annum (tpa) of nickel and up to 8,000 tpa of cobalt. The ore will be mined at Marshall Pool, 55 km south-south-east of Leinster, and Lawlers, 10 km south of Leinster. Read more...Last updated: July 13, 2000
The proposal includes gold mining developments within a defined project area on Lake Lefroy a naturally occurring salt lake approximately 7 kilometres south-east of Kambalda. Thirteen sites have already been identified for development of open-cut gold mining pits, some with underground portals and mining. Additional sites may be identified within the defined project area. Waste rock dumps, access infrastructure and mining support facilities such as workshops and contractor's compounds will... Read more...