This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 14, 2025
The proposal is to source marine sands from Cambridge Gulf, north of Wyndham in northeast Western Australia, for export to overseas construction projects. The proposal is a vessel-based marine operation with a lifespan of up to 15 years. It does not involve the construction and operation of any shore-based facilities. The operation will involve a Sand Production Vessel (SPV) based generally on the design of a large Trailer Suction Hopper Dredger (TSHD). The proposed operational area (POA) is... Read more...Last updated: November 19, 2009
This proposal is for the first of two stages of long-term shellsand dredging, involving the continuation of shellsand extraction from specific locations on Success Bank, Parmelia Bank and West Success Bank, Owen Anchorage. Stage 1, as proposed, would create a 1.5km wide by 15m deep seaway through Success and Parmelia Banks by 2014. This stage would require the removal of 168.5ha of seagrass and 264.5ha of shallow bare sand, which can be potential seagrass habitat, to recover 30 million tonnes... Read more...Last updated: February 10, 1999
Dredging of approximately 9.1 million tonnes of shellsand from two zones on Success Bank, Owen Anchorage over the period 1997 to approximately the end of 2002. Shellsand of high quality, about 92% calcium carbonate is used by Cockburn Cement Ltd (the proponent) for the manufacture of quicklime and cement products. Read more...Last updated: August 4, 1994
Cockburn Cement Limited (the proponent) proposes to dredge 3.7 million tonnes of shell sand from 67ha of Success Bank over a two year period. The area would be dredged using existing plant and equipment. Of the 67ha that is proposed to be dredged, 17ha has substantial seagrass coverage. Read more...Last updated: February 6, 1992
Expansion of lime sands mining operation to 40,000 tonnes over a five year period. Read more...