Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (4) Apply Infrastructure filter
  • Industrial (1) Apply Industrial filter
  • Land use (1) Apply Land use filter

Filter by current status:

  • Ministerial Statement published (6) Apply Ministerial Statement published filter

Filter by relevant environmental factors:

  • (-) Remove Benthic Communities and Habitats filter Benthic Communities and Habitats
  • Marine Environmental Quality (6) Apply Marine Environmental Quality filter
  • Coastal Processes (3) Apply Coastal Processes filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • Social Surroundings (2) Apply Social Surroundings filter
  • Flora and Vegetation (1) Apply Flora and Vegetation filter
  • Terrestrial Fauna (1) Apply Terrestrial Fauna filter

Filter by Proponent:

  • Albany Port Authority (2) Apply Albany Port Authority filter
  • LandCorp (2) Apply LandCorp filter
  • Grange Resources Ltd (1) Apply Grange Resources Ltd filter
  • Southern Ports Authority (1) Apply Southern Ports Authority filter

Filter by region:

  • (-) Remove Great Southern filter Great Southern

Filter by last updated:

  • 2024 (1) Apply 2024 filter
  • 2022 (1) Apply 2022 filter
  • 2009 (1) Apply 2009 filter
  • 2006 (1) Apply 2006 filter
  • 1996 (2) Apply 1996 filter
  1. Home
  2. Proposal search
  3. Benthic Communities and Habitats
  4. Great Southern

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Cape Riche Seawater Desalination Plant (S46) [2383]

Last updated: July 4, 2024

Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...

Albany Port Expansion Project (S46) [2262]

Last updated: July 21, 2022

Change to condition 3 – Time Limit for Proposal Implementation. Extension of time limit of five years to 18 November 2025. Read more...

Albany Protected Harbour Development, Princess Royal Harbour, Albany

Last updated: February 19, 2009

LandCorp proposes to construct a boat harbour for commercial and recreational craft through the expansion of the existing Albany Town Jetty with a breakwater that will shelter a 6.6 hectare area of water. Read more...

Albany Foreshore redevelopment project

Last updated: April 28, 2006

The proposal is to reclaim a maximum of 3.5 hectares (ha) of Hanover Bay in Princess Royal Harbour to create a commercial and urban development along the Albany foreshore. This development involves tourist and residential accommodation, and industrial and maritime uses. As part of the development plan, it is proposed to provide services including drainage, sewerage, and connection to water mains and power. The foreshore redevelopment is part of a larger redevelopment plan for the Town of Albany. Read more...

Albany Port developments, Albany

Last updated: November 11, 1996

The proposal is to construct a new berth at the eastern end of the Port of Albany, reclaim 5.5ha of Princess Royal Harbour to provide land backing to the new berth, and dredge a basin 6.0ha in extent between the berths and the existing entrance channel to provide sufficient depth of water for ship handling purposes. Read more...

Service vessel facility, Princess Royal Harbour, Albany

Last updated: June 28, 1996

The proposal is to improve Albany Port's facility for the mooring of existing port service vessels and for a new large tug. The proposal involves: dredging of approximately 25,000 cubic metres (m 3 ) (1.6 hectares) of material to provide a maximum water depth of -6m CD (Chart Datum); reclamation of 0.4 hectares of PRH using dredge spoil; establishment of a coarse sand beach fronting the reclamation area; construction of a rubble mound breakwater, approximately 250 metres long, using... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.