This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: August 7, 2025
The Northern Terminal to Neerabup Terminal 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between Northern Terminal in Malaga and Neerabup Terminal in Pinjar, a length of approximately 29 km. Additionally, the Proposal includes the expansion of the two existing Western Power substations, Northern Terminal and Neerabup... Read more...Last updated: July 21, 2025
Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . Read more...Last updated: June 21, 2025
Keysbrook Leucoxene Pty Ltd is proposing to expand its current mining operation for the Keysbrook Mineral Sands Project, which operates under Ministerial Statement Numbers 810 and 1089, to include an additional 511.64 hectares of mining area located immediately west of the current operations. Read more...Last updated: June 19, 2025
The Proposal is to extend and redevelop the existing Army Groyne into a barge operations facility in South Thomson Bay at Wadjemup / Rottnest Island. The Proposal includes: Dredging for the purpose of construction for a breakwater/laydown area and for a barge turning circle. Use of dredge spoil for re-use as reclamation to create a laydown area. Extension of the existing Army Groyne to create a breakwater. Barge landing ramp. Ferry berth. Small craft landing facility. Fuel storage and... Read more...Last updated: May 19, 2025
The Rottnest Island Authority (RIA) propose to develop workers accommodation to support island businesses, enhance visitor experience and meet growing tourism needs for Wadjemup / Rottnest Island. The proposal is for 149 accommodation units for up to 336 people. The worker accommodation will be available specific workers who are required to reside on Rottnest Island for the purpose of delivering essential services to visitors and ensuring continued operations of the island. The proposal area is... Read more...Last updated: March 27, 2025
The proposal is to design and construct the extension of the Tonkin Highway from Mills Road West to South Western Highway. The proposal is approximately 32 km in length and includes the design, construction and use of a highway of six lanes from Mills Road West to Mundijong Road and four lanes from Mundijong Road to South Western Highway. Read more...Last updated: March 13, 2025
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: February 4, 2025
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: January 13, 2025
The proposal is to construct and operate a multi-use motorsport complex on Lot 78 Punrak Road Keysbrook, and to redirect stormwater to Lot 400 Wigg Road Keysbrook. The proposal would be used for road safety driver training, amateur car events, a go-kart track, V8 supercar events, motorbikes and world rally championships. The proposal would operate seven days a week from 8.00 am to 6.00 pm, with potential for extended hours over weekends for special events. Read more...