This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 15, 2016
The proposal is to operate a regional airport at the Four Mile Hill site. During the assessment of an expansion to the Busselton Regional Aerodrome , the proposal was changed under s.43A of the, Environmental Protection Act 1986, to remove the runway extension, widening and strengthening component. The details of the existing runway are defined in Schedule 1 of Ministerial Statement 901 for this proposal and, as such, a section 45C change to Ministerial Statement 901 has been approved for the... Read more...Last updated: December 8, 2016
As part of a broader program of shark hazard mitigation (see details below), the Government of Western Australia is implementing a shark hazard mitigation strategy which involves the deployment of baited drum lines to capture target species of large sharks (the proposal). The proposal involves the deployment of up to 72 baited drum lines and rapid response within marine monitoring areas (MMA) in the metropolitan and the South West regions until 30 April 2014. The proposal commenced on 25... Read more...Last updated: December 8, 2016
Cristal Australia Pty Ltd proposes the Wonnerup North Mineral Sands Project located approximately 10 kilometres east of Busselton, City of Busselton. The project would involve dry mining and processing of mineral sands ore from the Wonnerup North deposit at a rate of approximately 2.3 million tonnes (Mt) per annum over eight years. Read more...Last updated: December 7, 2016
The Southern Ports Authority proposes to construct a 230 metre (m) rock revetment wall to provide erosion protection on port authority land and undertake sand renourishment along eastern Koombana Beach, Bunbury. Read more...Last updated: December 7, 2016
The Water Corporation proposes to construct a wastewater pressure main from Monash Boulevard Pump Station to Bunbury Wastewater Treatment Plant and has referred a small portion of the pipeline between Verschuer Place and Southwest Highway, Davenport, to the Environmental Protection Authority (EPA). In considering the proposal the EPA notes that the section of pipe alignment referred intersects the corner boundary of a wetland mapped under the, Environmental Protection (Swan Coastal Plain Lakes... Read more...Last updated: December 6, 2016
The proposal is to clear approximately 22 hectares of native vegetation on Collie Agricultural Area Lot 37 Harris Road, Picton. The proposal includes clearing of native vegetation within two wetlands. Read more...Last updated: November 22, 2016
The Bunbury Port Authority has prepared this plan to guide future development and decision making within the Inner Harbour and to conform to the strategic planning requirements under the, Port Authorities Act 1999, . It will also provide greater certainty of land use and development for port users, the Bunbury Port Authority and other decision making authorities, neighbouring landowners and the community. Read more...Last updated: June 29, 2016
The proposal is to develop an open cut coal mine at the Premier deposit in the Shotts Sub-Basin of the Collie Coal Basin. The Premier Coal Mine would supply approximately 2 million tonnes of coal per year to the proposed private power station due to be built by 1996. It is a proposed open cut coal mining operation which will have a life of 30 years and is on the scale of the Muja mining operation. The mining method will follow the practices being used in the existing open cut operations... Read more...