This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 20, 2016
Mineral Resources Limited (the proponent) proposes to construct and operate a Pilbara Bulk Ore Transportation System (BOTS), and associated infrastructure. The BOTS extends 330 kilometres from the Iron Valley mine site tenement boundary (M47/1439) to the Port Hedland Pilbara Port Authority boundary. Read more...Last updated: December 5, 2016
The proponent, Mount Gibson Mining Limited, proposes to mine hematite ore from the Iron Hill and Iron Hill South Deposits. The Iron Hill Deposits are part of the Mt Gibson Range, which is located approximately 270 kilometres (km) east-south-east of Geraldton. The proposal is located within a 112 hectare (ha) development envelope. The proposal is for the development of two mine pits (20 ha), a waste rock landform (30 ha) and support infrastructure (37 ha), which includes topsoil stockpiles and... Read more...Last updated: November 21, 2016
Sinosteel Midwest Corporation proposes an expansion of its existing operations at the Blue Hills Iron Ore Mine, involving the construction and operation of two new mine pits and waste rock dumps. A new processing plant and additional road infrastructure will also be established. Read more...Last updated: September 20, 2016
The proposal is to construct and operate an iron ore mine in the Goldfields region of Western Australia. The proposal involves mining of hematite direct shipping ore (DSO) from a single open pit on the Yendilberin Hills, which form part of the Finnerty Range. Read more...Last updated: August 31, 2016
Austeel Pty Ltd proposes to mine iron ore from the George Palmer Orebody on a pastoral lease about 25km south of Cape Preston. Ore will be fed to a purpose-built process plant to produce up to 13.8 million tonnes per annum of pellet iron and 4.7 million tonnes per annum of direct reduced iron (DRI) and/or hot briquetted iron (HBI). The products will be exported via a new port to be built at Cape Preston and Preston Island. Associated components comprise waste dumps, tailings storage facility,... Read more...Last updated: June 1, 2016
The proposal involves an extension to the Wheelarra Hill open pits and overburden storage areas, and the mining of the South Jimblebar and Hashimoto deposits, with disposal of overburden into adjacent Overburden Storage Areas (OSAs) and in-pit disposal. Inquiry under s46 related to Ministerial Statement 857, the subject of EPA Report 1371. Read more...Last updated: May 4, 2016
Life-of-mine proposal to mine iron ore within Mining Leases 270SA and 47/292 at a rate of approximately 45 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site. Read more...Last updated: May 2, 2016
The proposal is to develop an iron ore mine on the Iron Valley tenement located in the Shire of East Pilbara approximately 90 kilometres north-west of Newman. The project would include an above watertable blast and hydraulic shovel open pit mine and supporting infrastructure including dry crushing and screening plant, run of mine pad, waste rock landform, internal roads, power production, hazardous materials storage, waste management facilities, office buildings and an accommodation camp. Read more...Last updated: March 3, 2016
The proposal includes the existing Hamersley Yandicoogina iron ore project and proposed expansion. The existing project includes open pit mining at the Junction Central and Junction South East operations and associated infrastructure, dewatering activities, closure and rehabilitation. The expansion includes the development of new pits at Junction South West and Oxbow, temporary waste landforms, the development of new infrastructure, additional dewatering and water disposal activities. The... Read more...Last updated: February 4, 2016
The West Pilbara Iron Ore Project Stage 1 – Mine and Rail proposal is to develop and operate eight iron ore deposits 35 to 85 km south of Pannawonica and a heavy-haulage railway that connects the mine area to the Anketell Point Port precinct. The EPA's assessment report (Report 1409) was released on 3 August 2011. The Minister for Environment approved the proposal for implementation, subject to the implementation conditions of Ministerial Statement 881 (30 November 2011). In August 2015,... Read more...