Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (2) Apply Iron Ore filter
  • Lead (1) Apply Lead filter
  • Mineral sands (1) Apply Mineral sands filter

Filter by current status:

  • EPA Report and Recommendations released - appeals closed (1) Apply EPA Report and Recommendations released - appeals closed filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter
  • Ministerial Statement published (1) Apply Ministerial Statement published filter
  • Ministerial Statement withdrawn under s.47A (1) Apply Ministerial Statement withdrawn under s.47A filter

Filter by relevant environmental factors:

  • Flora and Vegetation (4) Apply Flora and Vegetation filter
  • Terrestrial Fauna (3) Apply Terrestrial Fauna filter
  • Landforms (2) Apply Landforms filter
  • 37 (1) Apply 37 filter
  • Human Health (1) Apply Human Health filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (1) Apply Inland Waters Environmental Quality filter
  • Social Surroundings (1) Apply Social Surroundings filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter

Filter by Proponent:

  • AWE Perth Pty Ltd (1) Apply AWE Perth Pty Ltd filter
  • Hermitage Holdings Pty Ltd; Devereux Nominees Pty Ltd (1) Apply Hermitage Holdings Pty Ltd; Devereux Nominees Pty Ltd filter
  • Paloma Holdings Pty Ltd (1) Apply Paloma Holdings Pty Ltd filter
  • Pinecroft Pty Ltd (1) Apply Pinecroft Pty Ltd filter
  • Polaris Metals Pty Ltd (1) Apply Polaris Metals Pty Ltd filter
  • Rosslyn Hill Mining Pty Ltd (1) Apply Rosslyn Hill Mining Pty Ltd filter

Filter by region:

  • (-) Remove Mid West filter Mid West

Filter by last updated:

  • (-) Remove 2015 filter 2015
  1. Home
  2. Proposal search
  3. 2015
  4. Mid West

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Exploration drilling - Feral Prospect

Last updated: August 4, 2015

The proposal is for an exploration drilling program which involves disturbance and clearing for access tracks and drill pads, and fencing, on banded iron formation ranges of the Perenjori Hills. Read more...

Magellan Lead Carbonate Project - Inquiry under s. 46 to amend Ministerial Statement 905

Last updated: February 26, 2015

The Minister for Environment has requested that the EPA inquire into and report on the matter of changing the implementation conditions relating to Ministerial Statement 905 in order to: extend the time limit on shipments of lead carbonate through Fremantle Port (condition 3A); and reduce the amount of the financial assurance required and allow the release and reinstatement of the financial assurance in the event operations are suspended (condition 18). Read more...

EP 413 3D Seismic Acquisition Survey

Last updated: February 20, 2015

The proposal is to undertake a 3D seismic acquisition survey across a 10,600 hectare area within exploration permit area EP413. The proposal comprises the following elements: Preparation of north-south and east-west vehicle access lanes by cutting vegetation above ground level and mulching greenstock with immediate replacement of mulch in-situ (also known as “raised blade roller mulching”). Laying source and receiver lines along lanes and insertion of geophones to a depth of 0.1 metres.... Read more...

Jackson 5 and Bungalbin East Iron Ore Project [2031A]

Last updated: January 12, 2015

The proposal is to construct and operate two iron ore mines, haul roads and mine infrastructure in the Yilgarn area of Western Australia, 100 kilometres north of Southern Cross. Following the appeal period and the Ministers subsequent determination on the Appeals received, the Minister remitted this proposal back to the EPA for assessment at the level of Public Environmental Review (8 weeks). Access the re-assessment of this proposal here. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.