Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (4) Apply Iron Ore filter
  • Infrastructure (2) Apply Infrastructure filter
  • Gold (1) Apply Gold filter

Filter by current status:

  • Ministerial Statement published (5) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (1) Apply Decision on whether to assess has been published filter

Filter by relevant environmental factors:

  • Flora and Vegetation (4) Apply Flora and Vegetation filter
  • Terrestrial Fauna (4) Apply Terrestrial Fauna filter
  • Inland Waters Environmental Quality (2) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Land (1) Apply Land filter

Filter by Proponent:

  • Cliffs Asia Pacific Iron Ore Pty Ltd (2) Apply Cliffs Asia Pacific Iron Ore Pty Ltd filter
  • Esperance Port Sea and Land (1) Apply Esperance Port Sea and Land filter
  • Macarthur Minerals Limited (1) Apply Macarthur Minerals Limited filter
  • Polaris Metals Pty Ltd (1) Apply Polaris Metals Pty Ltd filter
  • St Ives Gold Mining Company Pty Ltd (1) Apply St Ives Gold Mining Company Pty Ltd filter

Filter by region:

  • (-) Remove Goldfields Esperance filter Goldfields Esperance

Filter by last updated:

  • (-) Remove 2013 filter 2013
  1. Home
  2. Proposal search
  3. 2013
  4. Goldfields Esperance

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Carina Iron Ore Mine (s46)

Last updated: December 12, 2013

The proposal is to construct and operate an iron ore mine in the Goldfields region of Western Australia. The proposal involves mining of hematite direct shipping ore (DSO) from two open pits on the Yendilberin Hills, which form part of the Finnerty Range. Inquiry into the matter of amending condition 5-2 of Ministerial Statement 852 to remove the clearing requirement for the S2 and W22 vegetation communities. Read more...

Gold Mine Developments on Lake Lefroy (s46)

Last updated: December 6, 2013

Proposed Gold Mining at Lake Lefroy. Inquiry under s46 to amend Ministerial Statement 548 . Read more...

Yilgarn Operations - Windarling Range W4 East Deposit

Last updated: November 20, 2013

The proposal is to construct and operate an open cut iron ore mine and haul road at the Windarling Range W4 East Deposit, located approximately 130 kilometres north of Southern Cross. Read more...

Yilgarn Operations Deception Deposit

Last updated: November 5, 2013

The proposal is to construct and operate an open cut iron ore mine, waste rock landform, ore stockpile, haul road and associated infrastructure, 150 kilometres north of Southern Cross. Read more...

Ularring Hematite Project

Last updated: October 24, 2013

The proposal is to develop an iron ore mine and associated infrastructure in the Goldfields region, 450 kilometres (km) east-north-east of Perth. The proposal includes a borefield and adjoining water pipeline 60km west of the mine site and a rail siding 130km east of the mine site and 8km south of Menzies. Read more...

Port of Esperance Maintenance Dredging

Last updated: August 5, 2013

Esperance Port Sea and Land proposes to undertake maintenance dredging in the Port of Esperance to return the bathymetry to design depth, with disposal of most sediments to an offshore disposal site and some sediments to an onshore disposal area. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.