This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 12, 1991
Bunbury Port Authority proposes to extend the Inner Harbour at Bunbury by dredging a strip of land to the south-east of the existing basin, to allow for two additional ship berths and associated on shore facilities. The dredged spoil would be used to complete the filling of partially filled areas, to make them suitable in accordance with current zonings for bulk storage and port related activities. Dredging would be undertaken by a cutter suction dredge to a depth of 12.2m. Material would be... Read more...Last updated: November 1, 1991
The proposal includes the following major elements: a 17 metre high homogeneous earth fill embankment; an embankment crest length of approximately 190 metres; a capacity at full supply level (87 metres AHD) of approximately 1,500,000 cubic metres; a surface area at full supply level of approximately 28 ha; a pump off take within the Margaret River and pipeline to the dam located along existing tracks; relocation of Rosa Brook Road close to the limit of the Brook's catchment; and possible... Read more...