Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Oil and gas filter Oil and gas

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by relevant environmental factors:

  • Benthic Communities and Habitats (3) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (3) Apply Marine Environmental Quality filter
  • Marine Fauna (3) Apply Marine Fauna filter
  • Coastal Processes (1) Apply Coastal Processes filter

Filter by Proponent:

  • West Australian Petroleum Pty Ltd (2) Apply West Australian Petroleum Pty Ltd filter
  • Ampol Exploration Limited (1) Apply Ampol Exploration Limited filter
  • BP Refinery (Kwinana) Pty Ltd (1) Apply BP Refinery (Kwinana) Pty Ltd filter
  • Lasmo Oil (Australia) Ltd (1) Apply Lasmo Oil (Australia) Ltd filter
  • Western Mining Corporation Ltd (1) Apply Western Mining Corporation Ltd filter

Filter by region:

  • Pilbara (3) Apply Pilbara filter
  • Perth (2) Apply Perth filter
  • Gascoyne (1) Apply Gascoyne filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • (-) Remove 1991 filter 1991
  1. Home
  2. Proposal search
  3. 1991
  4. Ministerial Statement published
  5. Oil and gas

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Proposed Roller Oilfield development offshore Onslow

Last updated: December 10, 1991

Proposal to develop the Roller Oilfield within permit area TP/3 Part 1, specifically the drilling of a minimum of seven development wells from four monopod structures. Read more...

Proposed exploration drilling programme within permit area TP3 Par 1, offshore Onslow

Last updated: October 25, 1991

Western Australian Petroleum Pty Ltd (WAPET) is operator for the participants in Exploration Permit No. TP/3 Part 1. WAPET has already drilled some 18 wells within the Permit Area, has developed the Saladin, Cowle and Yammaderry oilfields and is currently seeking approval to develop the Roller Oilfield. Over the next five year period, WAPET proposes to drill a further four to twelve exploratory wells within Permit Area TP/3 Part 1. Read more...

Feed flexibility project - BP Refinery

Last updated: July 29, 1991

The proposal consists of modifications to, replacement of, or expansions of, eight units on the existing plant. The units involved include the: hydrofiner unit; propane production unit number 1; new straight run gasoline 'minalk' unit; new catalytic cracked spirit 'minalk' unit; new sour water treatment facilities; new sulphur recovery unit; residue cracker gas recovery unit and propane production unit number 2; and residue cracker unit - particulate emissions. Read more...

Proposed Offshore Petroleum Exploration Drilling in EP TP/7 and TL/2, North West Shelf

Last updated: June 24, 1991

Two initial wells are proposed, followed by a minimum of four exploration wells over the next five years. To improve the efficiency of the formal assessment process and reduce repetition it has been agreed that, instead of submitting proposals for one well at a time, it would be acceptable to submit a proposal for a programme to address the entire permit area, provided that the CER adequately addresses all the relevant issues and that the site specific data would be submitted at a later stage,... Read more...

Harriet Gasfield Pipeline

Last updated: April 30, 1991

The proposal is to develop a gas field near the Harriet Oil Field on the North-West Shelf, 20 km north-east of Barrow Island. This will involve a gas pipeline to collect the gas from four small gas fields and bring it to Varanus Island where it will be treated at an already approved gas processing facility before being piped to the mainland and connected to the State Electricity Commission of Western Australia's (SECWA) Dampier-Wagerup pipeline. Read more...

Proposed exploration drilling, Exmouth Gulf, Lasmo Oil

Last updated: April 26, 1991

LASMO Oil (Australia) has proposed an offshore exploration drilling program for petroleum within its permit areas EP-342 and TP/9 at the open end of Exmouth Gulf. This proposal seeks environmental approval for the drilling of two wells in 1991 followed by a minimum of three others over the period 1992-1994. Read more...

Seismic survey EP 351, West of Watheroo

Last updated: February 6, 1991

The proposal is to conduct a seismic survey for petroleum within Exploration Permit 351, located about 200 km north of Perth. The company proposes to test for petroleum in an area lying immediately to the west of Watheroo National Park. A total of 70 km of seismic traverses is planned. Portions of the survey may encroach into the western side of Watheroo National Park, parts of Flora and Fauna Reserve 27872, and an area proposed as a national park to link the Watheroo and Alexander Morrison... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.