This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 30, 2016
The proposal is for the operation of a gold concentrate processing plant and associated infrastructure at Gidji approximately 17 km north of the City of Kalgoorlie-Boulder. Inquiry under s46 in regard to changing the implementation conditions of Ministerial Statement 28 and Ministerial Statement 77 . Read more...Last updated: May 31, 1999
Kalgoorlie Consolidated Gold Mines (KCGM), operator of Mt Charlotte underground gold mine in Kalgoorlie, proposes to mine two pits adjacent to Mt Charlotte. These pits will uncover the floor pillars of the Reward and Northern orebodies closest to the surface. the underground portions of these orebodies have already been mined as far as possible from underground. Read more...Last updated: December 7, 1993
The proposal is for Stage 2 of the Kanowna Belle Gold Mine, comprising the construction and operation of a sulphide concentrate oxidation plant (roaster) within the existing mine site infrastructure. Stage 2 will provide the necessary facilities to further treat high sulphide containing ores to remove the gold that is not extracted in the Stage 1 plant. Stage 2 will include the addition of a vacuum filter, storage tanks, a roaster, gas train and stack, and additional cyanidation tanks. Read more...