Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Industrial filter Industrial
  • Infrastructure (1) Apply Infrastructure filter

Filter by current status:

  • Ministerial Statement published (3) Apply Ministerial Statement published filter
  • Ministerial Statement withdrawn under s.47A (2) Apply Ministerial Statement withdrawn under s.47A filter
  • Environmental Scoping Document approved (1) Apply Environmental Scoping Document approved filter

Filter by relevant environmental factors:

  • (-) Remove Social Surroundings filter Social Surroundings
  • Flora and Vegetation (5) Apply Flora and Vegetation filter
  • Terrestrial Fauna (5) Apply Terrestrial Fauna filter
  • 37 (3) Apply 37 filter
  • Terrestrial Environmental Quality (3) Apply Terrestrial Environmental Quality filter
  • Benthic Communities and Habitats (2) Apply Benthic Communities and Habitats filter
  • Inland Waters Environmental Quality (2) Apply Inland Waters Environmental Quality filter
  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • 3144 (1) Apply 3144 filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Inland Waters (1) Apply Inland Waters filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter

Filter by Proponent:

  • Albemarle Lithium Pty Ltd (1) Apply Albemarle Lithium Pty Ltd filter
  • Grange Resources Ltd (1) Apply Grange Resources Ltd filter
  • NW Interconnected Power Pty Ltd (1) Apply NW Interconnected Power Pty Ltd filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Wespine Industries Pty Ltd (1) Apply Wespine Industries Pty Ltd filter
  • Western Australian Land Authority (trading as DevelopmentWA) (1) Apply Western Australian Land Authority (trading as DevelopmentWA) filter

Filter by region:

  • South West (3) Apply South West filter
  • Pilbara (2) Apply Pilbara filter
  • Great Southern (1) Apply Great Southern filter

Filter by last updated:

  • (-) Remove 2024 filter 2024
  1. Home
  2. Proposal search
  3. Industrial
  4. Social Surroundings
  5. 2024

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Albemarle Kemerton Plant

Last updated: November 25, 2024

Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...

Utah Point Berth Project (Stage B)

Last updated: September 27, 2024

The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...

Cape Riche Seawater Desalination Plant (S46) [2383]

Last updated: July 4, 2024

Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...

Major (staged) expansion of pine log sawmill, Moore Road, Dardanup

Last updated: May 21, 2024

The proposal is for a major staged expansion to Wespine's operations at the pine log sawmill, Moore Road, Dardanup. By making adjustments, replacements and additions to the existing plant and equipment and methods of operation, Wespine proposes to progressively increase the throughput of the sawmill, via a series of stages, from the current annual log input capacity of 70,000 m 3 to 400,000 m 3 over a ten year period. Major changes involved in the upgrade of the Dardanup pine log sawmill... Read more...

Asian Renewable Energy Hub

Last updated: April 11, 2024

NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...

Kemerton Strategic Industrial Area (KSIA)

Last updated: April 2, 2024

DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.