This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 20, 2002
Methanex proposes to develop a methanol complex on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay – Hearson Cove Industrial Area, approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. Approximately 84 hectares of the 100 hectare site will be cleared to accommodate the methanol complex. Read more...Last updated: December 20, 2002
The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...Last updated: December 18, 2002
This proposal relates to the establishment, by undertaking clearing and earthworks, of a section of the western portion of the Burrup East-West Corridor west of Burrup Road, for the installation of anticipated infrastructure services within it. Services to be potentially located in the proposed corridor include sealed conveyors, an inspection and maintenance track, pipelines, transmission lines and cables, and communications. Pipelines using this corridor are anticipated to carry liquid... Read more...Last updated: December 10, 2002
WA Plantation Resources propose to develop a 1.0 million tonnes per annum capacity woodchip mill approximately 6km south east of Donnybrook. Read more...Last updated: December 6, 2002
Proposal by Hope Downs Management Services Pty Ltd (hereafter referred to as HDMS) to construct a rail line and port facilities to support the development of an iron-ore mine, based on the Hope 1 Deposit. Read more...Last updated: November 28, 2002
Shark Bay Salt Joint Venture proposes to dredge the existing shipping channel in Freycinet Estuary, Shark Bay. The channel is used for the transport of salt from the proponent's ship loading facility at Slope Island. The proposal involves maintenance dredging and some capital dredging. Read more...Last updated: October 2, 2002
The proposal is for the construction and operation of a 132 kilovolt transmission line, approximately 80 kilometres in length, from the Cataby substation to the Eneabba substation. Read more...Last updated: September 13, 2002
The proposal being assessed is for the diversion of 8 gigalitres a year (on average) (GL/yr) of unallocated water resources in the Samson Catchment to be diverted for public water supply, the construction of a pipe head dam and related infrastructure. The Samson Brook Redevelopment Scheme is a key element of the Water Corporation’s drought recovery plan. Read more...Last updated: August 21, 2002
The proposal is to build a transmission line with a maximum capacity of 330 kV from the Pinjar gas turbine station to the Cataby substation. The transmission line, which is primarily lattice tower construction up to 60 m high, traverses State Forest 65 South (Gnangara Park), Bush Forever Site 380, Gingin Stock Route Nature Reserve, State Forest 65 North and private property. The proposed line route is approximately 123 km long and involves the permanent clearing of up to approximately 2.9 ha of... Read more...Last updated: July 31, 2002
The Geraldton Port Authority (GPA) proposes to upgrade the Port of Geraldton (otherwise known as the Port Enhancement Project (PEP)) and undertake preparatory works for the Town Beach Foreshore Redevelopment Project. The objective of the PEP is to enable vessels to sail from the port fully laden. Read more...Last updated: April 10, 2002
The proposal involves an expansion of the existing Dampier Public Wharf to provide improved facilities capable of servicing the future needs of industry in the area. The key components of the proposal are: construction of a 60-81 m long load-out facility south of the existing wharf; cut and fill operations to create a land backing to the facility (1.9 ha, of which 0.8 ha is reclaimed land); and quarrying of a 4.1 ha cargo lay-down and storage area. Read more...Last updated: March 18, 2002
The Brookdale Liquid Waste Treatment Facility (LWTF) has been operating under environmental approvals since 1988 as a septage treatment plant. The facility was also licenced by the Department of Environmental Protection (DEP) to receive some specific types of hazardous liquid waste for treatment to render them nonhazardous or utilised on-site as reagents for treating other liquid wastes. This proposal is for a change to plant processes and waste acceptance criteria for this facility to enable... Read more...