This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 30, 2020
Austral Bricks is proposing the redevelopment of the Cardup Brickworks, which includes the expansion of the existing factory, increasing the design capacity from 200,000 to 250,000 tonnes per annum. The site is located in the southern extremity of Byford. Additional ancillary improvements include the installation of a new baghouse scrubber and a new primary crusher located in the floor of the pit. The proposal would include: Expanding the capacity from 200,000 to 250,000 tonnes per annum; New... Read more...Last updated: May 18, 2020
Changes to condition 2 (Proponent Commitments), condition 4 (Compliance Audit and Performance Review), condition 5 (Decommissioning Plan), condition 6, (Review of Options for the Transport of Solid Sodium Cyanide), condition 7 (Transport of Solid Sodium Cyanide), condition 8 (Transport of Liquid Sodium Cyanide), condition 9 (Noise Management), condition 10 (Emissions Verification) and condition 11 (Cyanide Monitoring). Read more...Last updated: April 14, 2020
Eastern Metropolitan Regional Council propose to construct and operate a Community Recycling Centre (CRC) and Waste Transfer Station (WTS) within the existing Hazelmere Resource Recovery Park, at Lots 814, 100 and 301 Lakes Road Hazelmere, in the City of Swan. The CRC would be accepting a range of materials for reuse, recycling and disposal from community members, while the WTS would provide for the short-term storage capacity for consolidation of various waste streams including refuse and food... Read more...Last updated: December 8, 2016
BAE Systems Australia Ltd is proposing dredging of approximately 1.3 hectares to -6.0m CD and construction of a 75m long land backed wharf close to the existing shoreline. Dredging is proposed to commence in September 2013 and is estimated to take 4 weeks in duration. Construction of the land backed wharf will take up to 9 months. Read more...Last updated: July 18, 2016
Keppel Holdings proposes the development and operation of a mobile concrete batching plant at Lot 105 (No. 2) Clune Street, Bassendean. The proposal site is located within the Bassendean Industrial Area. The proposal includes the construction of buildings and associated car and truck parking. Read more...Last updated: June 20, 2016
The Department of Defence proposes to undertake maintenance dredging of accumulated sediments alongside its marine infrastructure on the eastern side of Garden Island, in Cockburn Sound, to return naval waters to navigable depths. Approximately 1,900 cubic metres (m 3 ) of material is to be excavated from four locations in Careening Bay and 5,480m 3 of material from the Armaments Wharf in Sulphur Bay. The proposed dredging method is to use a long reach excavator with a bucket fitted with a... Read more...