Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (4) Apply Iron Ore filter
  • Infrastructure (3) Apply Infrastructure filter
  • Sand, rock, gravel and clay (2) Apply Sand, rock, gravel and clay filter
  • Clearing (1) Apply Clearing filter
  • Coal (1) Apply Coal filter
  • Industrial (1) Apply Industrial filter
  • Rare earth elements (1) Apply Rare earth elements filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • Ministerial Statement published (8) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (3) Apply Decision on whether to assess has been published filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter

Filter by preliminary environmental factors:

  • (-) Remove Hydrological Processes filter Hydrological Processes
  • Flora and Vegetation (10) Apply Flora and Vegetation filter
  • Inland Waters Environmental Quality (7) Apply Inland Waters Environmental Quality filter
  • 37 (6) Apply 37 filter
  • Terrestrial Fauna (6) Apply Terrestrial Fauna filter
  • Social Surroundings (2) Apply Social Surroundings filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter

Filter by Proponent:

  • Atlas Iron Limited (1) Apply Atlas Iron Limited filter
  • Aviva (1) Apply Aviva filter
  • BHP Iron Ore Pty Ltd. (1) Apply BHP Iron Ore Pty Ltd. filter
  • Central West Coal (1) Apply Central West Coal filter
  • Fortescue Metals Group (1) Apply Fortescue Metals Group filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • LG and HM McDonald (1) Apply LG and HM McDonald filter
  • Point Grey Development Company Pty Ltd (1) Apply Point Grey Development Company Pty Ltd filter
  • Reed Resources Ltd (1) Apply Reed Resources Ltd filter
  • Robe River Iron Associates (1) Apply Robe River Iron Associates filter
  • Shire of Northam (1) Apply Shire of Northam filter
  • Water Corporation (1) Apply Water Corporation filter
  • Western Australian Land Authority (1) Apply Western Australian Land Authority filter

Filter by region:

  • Pilbara (5) Apply Pilbara filter
  • Mid West (2) Apply Mid West filter
  • Peel (2) Apply Peel filter
  • Gascoyne (1) Apply Gascoyne filter
  • South West (1) Apply South West filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • (-) Remove 2012 filter 2012
  1. Home
  2. Proposal search
  3. Hydrological Processes
  4. 2012

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Newman Satellite Development - Orebody 23

Last updated: December 4, 2012

The proposal is for mining of iron ore below the watertable from the Orebody 23 deposit on the Ophthalmia Range, including de-watering operations, approximately 13 kilometres north-east of Newman, Shire of East Pilbara. Read more...

Gravel Extraction, Woottating

Last updated: December 3, 2012

The advice applies to a proposal referred to the Environmental Protection Authority (EPA) by Capital Recycling on 6 November 2012. The proposal is to extract gravel from Lot M1822 on Diagram 8755 Horton Road, Woottating in the Shire of Northam. The proposal is a small scale gravel quarry which is not operating on a continual basis. The potential impacts of dust, noise and groundwater exposure from this proposal are not considered to be such a significant matter that assessment by the Office of... Read more...

Barrambie Vanadium Project

Last updated: October 22, 2012

To develop an open-cut vanadium mine and process plant at Barrambie, 75 kilometres north-west of the Sandstone townsite and 116 kilometres south-east of Meekatharra Read more...

Augusta Wastewater Treatment plant (s. 46)

Last updated: October 4, 2012

Request to change implementation conditions of Ministerial Statement 126 . Read more...

Point Grey Marina

Last updated: August 1, 2012

The proposal is for the construction of an onshore marina (and associated boating infrastructure e.g. boat pens, jetties, navigational aids, entrance channel, protective groynes, public boat ramps and car parks) on the western side of the Point Grey peninsula. The proposal also includes the construction of a 2.5 kilometre navigation channel across the Harvey Estuary from the marina to the Dawesville Channel. Read more...

Pardoo Direct Shipping Ore Project Port Hedland

Last updated: July 24, 2012

The proposal is to develop and operate a direct shipping iron ore project in the Pilbara. The project involves the open-cut mining of eight small pits approximately 70 kilometres east of Port Hedland to obtain direct shipping ore quality haematite. Annual ore production will be 1.5 million tonnes. Read more...

Stage 2 Cockburn Central - Drainage and Wetland Management

Last updated: July 16, 2012

The proposal referred to the EPA and to which this advice applies is for Landcorp's Stormwater and Drainage Management Plan for Cockburn Central Stage 2. Stormwater management for Cockburn Central Stage 2 is proposed on Lot 9504 Beeliar Drive, which is adjacent to the main development site of Cockburn Central and contains a Resource Enhancement Wetland (REW) that is also a lake listed under the Environmental Protection (Swan Coastal Plain Lakes) Policy 1992. Read more...

Expansion to Limestone Quarry on Mining Lease 08/06 Sub Lease 3H/034, 8 km south-west of Exmouth

Last updated: May 30, 2012

The proposal is to clear up to 3.7 hectares of native vegetation for a limestone quarry, to screen the material on-site, re-establish an access road and rehabilitate all of the disturbed areas. Read more...

Central West Coal Project

Last updated: May 22, 2012

The project site is located approximately 15 kilometres south of Eneabba in the Shires of Coorow and Carnamah, Western Australia. The CWC Project involves open cut mining and supply of approximately 75 Mt of sub-bituminous grade coal to the proposed Coolimba Power Station at a rate of 2 to 2.5 Mtpa over 30 years. The South Eneabba Nature Reserve is at the southern end, east of the proposed mine, while the Lake Logue Nature Reserve is towards the northern end and on the western side of the... Read more...

Cape Lambert Port upgrade - increase in throughput to 85 Mtpa

Last updated: April 4, 2012

The proposal is to increase the throughput of iron ore to 85 million tonnes per annum at the Cape Lambert Port operations. Read more...

Io Direct Shipping Iron Ore Project

Last updated: April 2, 2012

The proposal is to expand Fortescue Metals' current operations within the Pilbara region, Western Australia to include the development of a new iron ore project, known as the Io Project, which is located within the Nyidinghu Study Area. The Project is located on Marillana Station approximately 40 kilometres (km) south of Fortescue’s Cloudbreak operations and approximately 100 km north-west of Newman. The major components of the Project are: An iron ore mine and resource comprising Brockman... Read more...

Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites (Stage B)

Last updated: March 28, 2012

The original proposal, as set out in the proponent’s PER, comprised four iron ore mines in the Pilbara region, an ore beneficiation plant, a borefield, an accommodation village and 160km of east-west railway connecting to the north-south link to Port Hedland. Since release of the PER, FMG has made several major modifications to the proposal: the proposed mines at Mt Lewin and Mt Nicholas have been excised; the connecting infrastructure to those minesites is not now needed, leading to a change... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.