This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 4, 2023
Southern Ports Authority propose to facilitate export of magnetite by allowing the construction of a new Berth 5 and expanding current anchorages in King George Sound. Berth 5 is to be constructed consisting of an offshore piled structure with mooring dolphins. Transhipment vessels will leave Berth 5, transit to an inner anchorage and load an ocean-going vessel for first-stage export. Vessels will then transit to a deeper anchorage to complete second-stage export. The anchorages are currently... Read more...Last updated: July 21, 2022
Change to condition 3 – Time Limit for Proposal Implementation. Extension of time limit of five years to 18 November 2025. Read more...Last updated: May 4, 2015
The proposal is for the dredging of 12 million cubic metres of sediments to widen and deepen the existing shipping channel into Princess Royal Harbour and to extend the shipping channel into King George Sound to allow access of cape-size vessels to the Port. Dredged material will be disposed offshore at a location in King George Sound. A portion of the dredged material will be used for reclamation of up to 9 hectares of Princess Royal Harbour to construct a new berth (Berth 7). Inquiry under... Read more...