This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2013
On 21 September 2011, Western Power, through the Minster for Energy, applied to the Minister for Environment for an approval under noise regulation 17 in relation to Western Power’s existing and future electrical distribution transformers. The basis of the application was that the noise emissions from a large number of distribution transformers operated by Western Power do not comply with the assigned noise levels specified by the noise regulations, due to their proximity to noise sensitive... Read more...Last updated: November 18, 2013
The Public Transport Authority of Western Australia proposes to develop a pedestrian bridge over the Swan River linking the East Perth foreshore to the Burswood Peninsula and the construction of a bus hub at East Perth. The proposal forms the third component (Part 3) of the new Perth Stadium Project, Part 1 being the construction of the Stadium and associated Sports Precinct, and Part 2 being the construction of the Transport Corridor Infrastructure including rail works and upgrades to the... Read more...Last updated: September 2, 2013
Water Corporation is proposing to implement a 14 gigalitre per annum groundwater replenishment scheme (GWRS) of recycled wastewater to the Leederville and Yarragadee aquifers, located on the Swan Coastal Plain. Read more...Last updated: January 11, 2013
The referral received by the EPA is for the construction and operation of the stadium. The EPA considers that the main environmental issues are associated with the pre-construction site works, which will stabilise and prepare parts of the site before the main construction phase. The site was previously used as a landfill facility and has been classified as "possibly contaminated - investigation required" under the Contaminated Sites Act 2003. Preconstruction site works will... Read more...