This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 19, 2025
The proposal is for the extension of the existing Kwinana Swift Power Station (KSPS) to increase the site’s total generation capacity to 370 megawatts (MW). It involves the construction and operation of 250 MW Open Cycle Gas Turbine (OCGT) and associated infrastructures. The existing KSPS units are not part of this proposal. The K2 power station would operate as a peaking power station, connecting into the South West Interconnected System (SWIS) to supply additional power during periods of peak... Read more...