This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 14, 1996
The proposal is to develop and implement a programme to improve management of dust and reduce the dust impacts from BHP Iron Ore's operations at Finucane Island and Nelson Point in Port Hedland. The proponent has acknowledged that iron ore dust from its operations is an issue of concern to the Port Hedland community and has implemented some dust control measures. In addition, during the assessment of the Hot Briquetted Iron (HBI) project in Port Hedland (EPA, 1995), the EPA recognised that... Read more...Last updated: July 2, 1996
The proposal is to expand alumina production from 2.0 million tonnes per annum to 3.5 million tonnes per annum at the Worsley Alumina Refinery, Collie, and undertake associated bauxite mining activities at Boddington. Read more...Last updated: June 6, 1996
The proposed nickel/cobalt ore mining and processing operation is located near the former gold mining centre of Murrin Murrin, approximately 60km east of Leonora, in Western Australia. The project involves the establishment of open cut mine pits, a processing plant and associated infrastructure. The project will produce refined products of nickel and cobalt as well as an ammonium sulphate by-product. Read more...Last updated: April 19, 1996
The proposal is for the establishment of an iron ore mine at Tallering Peak, 70km north of Mullewa; transport of iron ore by road and rail to the GSP at Narngulu Industrial Estate near Geraldton; and transport of steel product by road from Narngulu to the Port of Geraldton for export. Read more...Last updated: April 9, 1996
The proponent, Tiwest Joint Venture (Tiwest), seeks an amendment to the environmental conditions of Ministerial Statement 59 under Section 46 of the, Environmental Protection Act 1986, , to allow the synthetic rutile plant at Chandala an increase in nameplate production from 130,000 to 200,000 tonnes per annum (tpa) of synthetic rutile. The plant was originally assessed by the Environmental Protection Authority (EPA) in December 1988 and was approved by the Minister for the Environment to build... Read more...Last updated: March 26, 1996
The proposal is to construct and operate a Direct Reduction/Hot Briquetted Iron plant near Cape Lambert in the Pilbara region of Western Australia. The proposed plant will utilise conventional and commercially proven ore concentration, pelletising and gas-based shaft furnace direct reduction technologies to convert Pilbara iron ore (fines and lump) into HBI. The production capacity of the plant is expected to be 3.6 million tonnes per year (Mtpa) of HBI. The project may be developed in stages... Read more...Last updated: March 15, 1996
The proposal is to establish an export abattoir at Narrikup, 20km north of Albany. Read more...Last updated: March 15, 1996
The proposal is to place contaminated materials into an enlarged portion of an engineered containment cell located onsite at McCabe Street in Mosman Park. The proponent wishes to increase the size of the containment cell and to amend the environmental conditions of Ministerial Statement 338 relating to removal of drainage outfalls at the site. This is the inquiry under s46 into the requested amendments. Read more...