This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 24, 2024
Re-opening of an iron ore mine; construction of associated infrastructure and a port facility on Koolan Island; and subsequent rehabilitation and decommissioning of the site. Read more...Last updated: September 1, 2021
The proposal is an expansion of the existing Sino Iron Project approved under Ministerial Statement 635 (as amended). The proposal is required to accommodate continuation of mine operations associated with the existing two billion tonnes mining rights afforded to Sino Iron and Korean Steel in accordance with existing commercial agreements. It includes the expansion of the mine pit, waste dumps and Tailings Storage Facilities. The proposed mine pit expansion will increase in depth from 220 m to... Read more...Last updated: October 2, 2020
The proposal involves the development and operation of the Hope Downs 4 Iron Ore Mine (HD4), located in the Pilbara region in the shire of East Pilbara. It includes the development and operation of an above and below the water table greenfields iron ore mine and associated infrastructure. Ore from the HD4 proposal would be transported via a new railway to existing rail infrastructure near the existing Hope Downs 1 Iron Ore Mine then to port facilities on the coast. The mine would operate... Read more...Last updated: December 13, 2017
The proposal is to construct and operate a magnetite iron ore mine, processing plant and associated infrastructure, linear infrastructure corridor accommodating the raw water pipeline to the borefield near Mingenew, and access road to Morawa, in the Midwest region of Western Australia. Read more...Last updated: June 22, 2017
Proposal by BHP Iron Ore Pty Ltd to develop 14 iron ore deposits at Mining Area C-Northern Flank, 100 km north west of Newman. Read more...Last updated: March 12, 2014
The proposal is to construct and operate an iron ore mine and associated infrastructure at Weld Range. Open pit mining would occur above and below the water table and would involve dewatering. Excess water would be discharged to a lined evaporation pond. Read more...Last updated: January 16, 2014
The proposal is for the development of an iron ore mine at deposits 'A' and 'B' and ore processing operation at West Angelas 130 kilometres west of Newman, and construction of a rail line and expansion of port facilities at Cape Lambert. Read more...Last updated: November 20, 2013
Portman Iron Ore Limited proposes to expand the existing Koolyanobbing iron ore mine by commencing new mining at Windarling Range and Mt Jackson and linking the new minesites to Koolyanobbing by a haul road or railway. Read more...Last updated: November 7, 2013
To establish an iron ore mine in the Hope Downs area, 75km north-west of Newman, including facilities for limited processing of the ore, and a rail connection from the mine to a rail network for the transport of iron ore product to the coast. Read more...Last updated: January 9, 2012
The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: November 18, 2002
The proposal is to construct and operate a commercial scale HIsmelt Process Plant at Kwinana in Western Australia. The plant will be located at the site currently occupied by the existing HIsmelt Research and Development Facility (HRDF) within the northern portion of the Kwinana Industrial Area (KIA), 40km south of Perth. The Stage 1 plant will initially produce around 820,000 tonnes per annum of pig iron. If the Stage 1 plant is found to be technically and commercially viable, the proponent... Read more...Last updated: October 13, 1997
The proposal is to to increase the production of Kingstream Resources' recently assessed Mid West Iron & Steel Project Geraldton Steel Plant (GSP), at the Narngulu Industrial Estate south-east of Geraldton, from 1.0 Mt/a to 2.4 Mt/a. Changes are also proposed to the product, specifically that slab steel be produced rather than rolled coil, with resulting changes in the requirement for major plant. Read more...Last updated: June 25, 1996
The proposal is to construct and operate additional infrastructure to satisfy the requirements of the recently proposed AUSI Iron Project Direct Reduced Iron (DRI) plant near Wickham in the Pilbara region of Western Australia, the subject of EPA Bulletin 794. Read more...Last updated: September 5, 1995
The proposal is to build and operate a Hot Briquetted Iron (HBI) plant of nominal capacity of 2 Mtpa, approximately 7.5 km south-west of Port Hedland. The plant will produce a nominal 2 Mtpa of iron briquettes, which can be used as a feedstock for electric arc furnaces in the steel making process. Read more...