This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 13, 2007
This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors and principles relevant to the proposal by the Water Corporation to construct, operate and maintain a new Wastewater Treatment Plant (WWTP) and ocean outfall at Alkimos. The proposal is to develop the plant in stages up to an operational capacity of 160ML/day beyond 2050. There are two proposed sites for the WWTP, Site A and Site B... Read more...Last updated: July 2, 2007
The main features of the proposal are to; extend the existing northern and southern berth pockets at the Parker Point wharf and to enable four vessels (two on the north side and two on the south side) to moor alongside the wharf at any one time, although only two vessels can be loaded at any one time; widen and deepen the southern swing basin to provide safe approaches for 220,000 DWT vessels using the southern berths; widen the northern approach route to provide safe navigation for arriving... Read more...