This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 29, 2024
Woodside Energy Ltd (Woodside) proposes to construct and operate the Woodside Solar Facility in the Maitland Strategic Industrial Area, located approximately 15 kilometres south-west of Karratha, in the Pilbara region of Western Australia. The proposal will generate electricity (up to 500 megawatts) from a large-scale solar photovoltaic (PV) farm and includes energy storage (battery) infrastructure. The Proposal is only for the infrastructure associated with the generation and storage of... Read more...Last updated: May 1, 2015
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal is further documented in Ministerial Statement 837 and EPA Report 1349 . This assessment deals with a request for a change to the Time... Read more...Last updated: July 22, 2013
The proposal is to construct and operate a tidal power station across the mouth of Doctor’s Creek, near Derby, for the generation of electricity. The proposal also includes the construction of power lines to distribute power to major centres in the West Kimberley., Note:, This assessment is of a modification to the Derby Tidal Power proposal (previously reported in Bulletin 942 and Bulletin 984). Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: July 2, 2002
The construction and operation of a 110 MW gas-fired power station at the Boddington Gold Mine approximately 12 km north-west of Boddington and the construction of a natural gas pipeline to the power station, predominantly along the railway reserve between Pinjarra and Boddington. Read more...Last updated: October 27, 1992
The proposal is to establish a 2,500 kilowatt wind farm and associated 33kV powerline near Esperance. The wind farm is to be built within 'C' class Flora Reserve Number 24486, near Nine Mile Beach approximately 8km west of Esperance. Read more...