This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 18, 2000
Proposal to construct a gas to synthetics plant on the Burrup peninsula. Read more...Last updated: July 14, 1997
The proposal is to construct a pipeline fabrication site within the exrstmg Mardie Station Pastoral lease and existing Vacant Crown Land Reserve, approximately 45km south west of Dampier and 15km east of Cape Preston is detailed in the CER. Read more...Last updated: November 14, 1996
The proposal is to develop and implement a programme to improve management of dust and reduce the dust impacts from BHP Iron Ore's operations at Finucane Island and Nelson Point in Port Hedland. The proponent has acknowledged that iron ore dust from its operations is an issue of concern to the Port Hedland community and has implemented some dust control measures. In addition, during the assessment of the Hot Briquetted Iron (HBI) project in Port Hedland (EPA, 1995), the EPA recognised that... Read more...Last updated: March 26, 1996
The proposal is to construct and operate a Direct Reduction/Hot Briquetted Iron plant near Cape Lambert in the Pilbara region of Western Australia. The proposed plant will utilise conventional and commercially proven ore concentration, pelletising and gas-based shaft furnace direct reduction technologies to convert Pilbara iron ore (fines and lump) into HBI. The production capacity of the plant is expected to be 3.6 million tonnes per year (Mtpa) of HBI. The project may be developed in stages... Read more...