This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2013
On 21 September 2011, Western Power, through the Minster for Energy, applied to the Minister for Environment for an approval under noise regulation 17 in relation to Western Power’s existing and future electrical distribution transformers. The basis of the application was that the noise emissions from a large number of distribution transformers operated by Western Power do not comply with the assigned noise levels specified by the noise regulations, due to their proximity to noise sensitive... Read more...Last updated: March 26, 2012
The Environmental Protection Authority has completed its assessment of the application to amend the Environmental Protection (Western Power Transmission Substation Noise Emissions) Approval 2005 made by Western Power to the Minister for Environment on 21 September 2011. The application was referred to the EPA for assessment under regulation 17(9) of the Environmental Protection (Noise) Regulations 1997. Read more...Last updated: May 23, 2011
The Environmental Protection Authority (EPA) has completed its assessment of the application to amend the Environmental Protection (Pinjar Gas Turbine Station Noise Emissions) Approval 2004 made by Verve Energy to the Minister for Environment on 8 February 2011, and which was referred to the EPA for assessment on 11 April 2011. Read more...