This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 4, 2012
The proposal is to increase the throughput of iron ore to 85 million tonnes per annum at the Cape Lambert Port operations. Read more...Last updated: October 30, 2007
The proposed Mesa J mining development is a continuation of the sequential development of proven iron ore reserves along the Robe River Valley. This proposal relates to an iron ore mining operation of 600 million tonnes over a period of approximately 20 years. The major components of the proposed development include: Site preparation, including overburden removal and stockpiling of ore which will be extracted along the rail alignment to be constructed on the eastern escarpment of the new Mesa J... Read more...Last updated: July 12, 2007
A capital and maintenance dredging program to remove up to 2.5 million cubic metres of marine sediment from within State Waters adjacent to Cape Lambert, and disposal of up to 2 million cubic metres of uncontaminated dredge material to Spoil Ground 1. Read more...