This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 30, 1997
The proposal is to increase the production capacity of Tiwest's titanium dioxide plant at Kwinana. The proposal is to modify/expand the existing plant to allow an increase in production capacity from 80,000 tonne per annum (tpa) to 180,00 tpa of titanium dioxide pigment in three notional stages: Stage I: increase to 120,000 tpa, Stage 2: increase to 165,000 tpa and Stage 3: increase to nominally 180,000 tpa. The first and second stages of the expansion wilI require major modifications to... Read more...Last updated: April 24, 1997
The proposal is to extend the existing breakwater in the northern precinct of Jervoise Bay. In summary, the breakwater extension will: commence immediately west of the Cockburn Power Boat Association facility, be 700 metres (m) long, approximately 40m wide, and cover 2.8 hectares (ha) of seabed; be constructed of limestone rubble mound, as used in the existing breakwater and has an expected construction period of 40 weeks; and form a harbour with an entrance width of 120m at mean sea level. Read more...