This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 5, 1996
The proposal is to build and operate a rare earth plant on a site 4 km south of Alcoa Alumina Refinery and adjacent to the existing Rhone-Poulenc Gallium Plant at Pinjarra, approximately 100km south of Perth and 30 km south-east of Mandurah. The plant will produce 15,000 tonnes per annum (tpa) of solid rare earth nitrate concentrate. Read more...Last updated: April 9, 1996
The proponent, Tiwest Joint Venture (Tiwest), seeks an amendment to the environmental conditions of Ministerial Statement 59 under Section 46 of the, Environmental Protection Act 1986, , to allow the synthetic rutile plant at Chandala an increase in nameplate production from 130,000 to 200,000 tonnes per annum (tpa) of synthetic rutile. The plant was originally assessed by the Environmental Protection Authority (EPA) in December 1988 and was approved by the Minister for the Environment to build... Read more...Last updated: March 15, 1996
The proposal is to place contaminated materials into an enlarged portion of an engineered containment cell located onsite at McCabe Street in Mosman Park. The proponent wishes to increase the size of the containment cell and to amend the environmental conditions of Ministerial Statement 338 relating to removal of drainage outfalls at the site. This is the inquiry under s46 into the requested amendments. Read more...