This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 10, 1999
The proposal investigates the alternative water supplies that could be used to provide water required by future industries establishing at Kemerton. The proposal does not address the use of the water within the Kemerton Industrial Park nor any disposal or treatment of wastewater or effluent that may be required. These will be examined when individual industry development proposals are being considered. The Environmental Protection Authority has previously advised Landcorp, the estate manager,... Read more...Last updated: November 1, 1991
The proposal includes the following major elements: a 17 metre high homogeneous earth fill embankment; an embankment crest length of approximately 190 metres; a capacity at full supply level (87 metres AHD) of approximately 1,500,000 cubic metres; a surface area at full supply level of approximately 28 ha; a pump off take within the Margaret River and pipeline to the dam located along existing tracks; relocation of Rosa Brook Road close to the limit of the Brook's catchment; and possible... Read more...Last updated: February 27, 1991
The proposal is to construct a facility to treat wastewater from Augusta to secondary standards and dispose of the effluent by ground infiltration on an area adjacent to the ponds. The site selected is Unalienated Crown Land located approximately 3km south-west of the Central Business District of the town of Augusta. The wastewater from Augusta will be treated using oxidation ponds. Initially there will be 3 oxidation ponds operated in series to cater for a population of 1,000. Future upgrading... Read more...